closed #202397

City Construction Projects

320 N Jacob DR

Case Date:
4/30/2025

Cut pavement hole by city 3 months ago and never blacktop. Hole is still there and very, very annoying!! I believe it’s a job unfinished or forgotten by city workers transportation department! Thank you

closed #202435

City Construction Projects

Case Date:
5/2/2025

Construction equipment is parked on the sidewalk. The city would not let businesses park this equipment on the street, blocking access for cars. Why do you allow them to block access for pedestrians? Thank you. West 2nd street just east of eucild street northwest of street

closed #202690

City Construction Projects

1107 S Washington ST

Case Date:
5/14/2025

Gigabit workers left big utility mess —hazardous! I reported to them in February & contacted them several times but no repair—

closed #202737

City Construction Projects

Hillside Dr

Case Date:
5/16/2025

Why there road work on that intersection

open #202780

City Construction Projects

3549 N Hackberry ST

Case Date:
5/18/2025

Our neighborhood recently had our sidewalks updated to be ADA acceptable and with that our driveway and sidewalk by our house was tore up. The photo above is a spot in the sidewalk they did not fill with concrete and is a hazard to anyone walking. They also left big gaps in our yard where they fixed the sidewalks which is another hazard. If we could have someone come out and look and fix this issue so no one gets hurt.

closed #202952

City Construction Projects

414 E Cottage Grove AVE

Case Date:
5/26/2025

Cavity forming alongside water meter in ROW close to SW corner of lot.

closed #202961

City Construction Projects

2012 E Hillside DR

Case Date:
5/27/2025

The construction contractor has placed the Road Closed barricades in two of the three lanes on High St. at the Hillside intersection. This is impeding the flow of traffic and is going to cause an accident. Once three cars fill the left turn lane, High St. is effectively blocked to North/South travel. There is now only more traffic going North on High St. with the roundabout closure. Please have the barricades removed or placed to the sides of the road. If someone cannot read the road closure signage properly, they will have to pay the price once they reach the closed roundabout.

closed #202993

City Construction Projects

2012 E Hillside DR

Case Date:
5/27/2025

Since Roger Street is closed, all people who live off of high Street have to take high Street up to Morse Pike/Hillside. With these signs now up on both sides, it is down to one lane for no reason. There's no reason to have the northbound traffic on high Street blocked.

closed #199220

City Construction Projects

S Sare Rd & E Creeks Edge Dr

Case Date:
11/6/2024

Orange cone left out near sidewalk

closed #199235

City Construction Projects

1202 e 1st st and 1208 1st st

Case Date:
11/6/2024

There is a hole at the curb at the end our adjoining driveways, 1202 and 1208 E 1st. This has developed after the attempted temporary fix which was made after attempting to find the source of a water leak. This was made during the installation of Gigabit now. It is 17 inches deep and when covered with leaves, not visible. Please fix this to prevent damage to our cars.