closed #203227
Fire Hazards
500 S Park Ridge RD
- Case Date:
- 6/6/2025
Building have exposed wires on outside of building building #9
Building have exposed wires on outside of building building #9
Exposed and loose wire drilled through the side of building. The light works so wire is hot
In front of maintance building
You sure they ever even contacted duke about the problem
Trash and overgrowth blocking alley
When road work done on 500 2nd street
The traffic left turn light when on 2nd street turning left onto Roger’s Street is extremely short, only 5 seconds. It needs to be much longer with all the construction in the area. Only two cars are able to turn on the arrow and it’s constantly backed up. Please consider this change, I work on 1St street and this impacts my commute daily.
Crosswalk button closest to the old hospital (grass lot) is extremely hard to push and most times does not work when you push it. I’m not sure if it needs to get adjusted but I constantly have to cross without using it.
2nd & Rogers, heading south on Rogers -- people are idiotically going straight from the left turn lane. The lanes on Rogers south of 2nd were shifted for construction, and people have decided this means they should use the left turn lane to go straight. This morning, 3 cars went straight from the left turn lane, cutting off straight traffic from the straight/right lane at the light. People are just going through the intersection straight from the left lane with total disregard to the lane they are in and how common sense and logic work. Sit a cop out there and you can write tickets all day long. Put up some better signs with the construction to keep people using the proper lanes. Accidents are waiting to happen.