closed #170668
Water Quality
1111 N Jackson St, Bloomington, Indiana, 47404
- Case Date:
- 10/9/2019
I noticed our water is cloudy today - I noticed it in the toilet then in the restroom sink.
I noticed our water is cloudy today - I noticed it in the toilet then in the restroom sink.
New water meters are being put in along Old State Road 37. There is a safety issue with the mess left behind. Workers have left large trash piles and large mounds of dirt behind where pedestrians walk. The gravel is settling and leaving dips in the grade.
There is a water leak that has been ongoing for atleast a couple months at the NE corner of 14th and College Ave.
water main break (again) 900 block of Grant and Dixie no water at 402 E Dodds, why would that break affect my address? Will we be notified if we need to boil water? We were not notified until after the fact when the last water main break happened a few weeks ago. I read it in the paper.
water main break (again) 900 block of Grant and Dixie no water at 402 E Dodds, why would that break affect my address? Will we be notified if we need to boil water? We were not notified until after the fact when the last water main break happened a few weeks ago. I read it in the paper.
Turned on the tap this morning and have no water. No construction going on, all was fine yesterday. This is 916 S Henderson St, 812-339-2628.
I live at 505 E Dixie St and we are without water this morning. Any idea when water service will be restored?
After installing the smart water meter CBU nor their contracted service provider left notification on our door that installation had occurred. On Monday of this week, CBU dug around the meter and within hours several water issues were present in our home. Debris in our drinking water (again not notified of work done, w tag on our door) seal blown off our dishwasher pump rendering it useless, and water saturating our carpet in the Living room. All occurring within hours of CBU being around the meter and digging. We have contacted and spoken with both contracted service personnel as well as the meter dept at CBU. We are currently in communication with assistant director. Today a service meter technician came to our property to take pics and "plugged" the smart meter back in to a housing that it had come undone from as per Ken Johnson. Again, we were home, the meter was handled and no courtesy knock or paper notice was put on our door . This is unacceptable as we had just been on the phone with CBU sharing our concerns. CBU Protocol has not been followed, drinking water was not safe guarded for my family, digging around a meter with no courtesy tag left on the door, meters installed with no courtesy tag left on the door including notice to flush the system or # to contact if there were issues, meter equipment not "plugged in" as per Johnson, and water leaks in our home which now require jack hammering into the slab. This is a deep concern of water safety, CBU Protocol disregarded, and extensive repair cost (3k or more). Mike Colliver (317)590-0115
Need to properly & permanently repair road cut for water main repair @ 4738 W Vernal Pike
Need to properly & permanently repair road cut for water main repair @ 4738 W Vernal Pike