closed #170868

City Construction Projects

Bloomington, Indiana

Case Date:
11/2/2019

Olcott park pathway to Jackson Creek middle school parking lot. When the temperature drops below freezing, this becomes a sheet of ice due to some drainage from the football field flowing down the paved path. Dozens of school children use the path to get to and from school as well as community members. It has been a high slip risk For the last few years as this path does not receive ice removal or salting on a regular basis. Instead of trying to keep up with salting or removing the ice on this long path I hope the city could look into rerouting the source of the drainage to not flow on the pedestrian path.

closed #170878

Trails

2400 S Rogers ST

Case Date:
11/4/2019

Just south of the intersection of Rogers and Coolidge the multi-use path on the west side of Rogers is heavily impeded by overgrowth of a tree. This is dangerous. As part of the B-Line detour, this needs to be trimmed back.

closed #170879

Trails

2304-2398 S Rogers St, Bloomington, Indiana, 47403

Case Date:
11/4/2019

Just north of the His & Her Salon on Rogers the multi-use path on the west side of Rogers is heavily impeded by overgrowth of a tree or bush thing. This is dangerous. As part of the B-Line detour, this needs to be trimmed back.

closed #170880

Trails

1606 S Rogers ST

Case Date:
11/4/2019

Near the power substation on Rogers across the street from Switchyard Park the multi-use path on the west side of Rogers is covered in gravel. The gravel runs the length of the substation north to south and needs to be swept up This is dangerous. As part of the B-Line detour, this should be deemed unacceptable for the City to allow for such unsafe conditions.

closed #170966

Trails

320 W 8th ST

Case Date:
11/14/2019

I think the Limestone Greenway is a wonderful addition to our Trails. However, I think it needs at least one trash receptacle. Otherwise, it will get trashed.

closed #170968

Trails

1900-1998 S Rogers St, Bloomington, Indiana, 47403

Case Date:
11/14/2019

The attached photo shows the detour for the B-Line Trail (closed for Switchyard construction) around 11am today. I had to carry my bike across the void. I am concerned that someone with accessibility issues who cannot lift their bike, or is in a wheelchair, would not be able to get by. The sidewalk on the opposite side of the road is closed as well. This is the west side of Rogers just north of the Rockport intersection. I do not see how this is allowed to happen.

closed #170988

Debris Removal (Sand, General Street Debris)

2258 E Cape Cod DR

Case Date:
11/17/2019

A large pile of leaves has been left covering the pedestrian path in SE Park.

closed #171012

Other

320 W 8th ST

Case Date:
11/20/2019

I am requesting information on city-wide events and classes.

closed #171069

Parks & Playgrounds

Bloomington, Indiana

Case Date:
11/29/2019

Sign not properly planted into the ground at the skatepark. It's barely into the earth with no apparent concrete footer underneath. I don't know if someone fell against it or if it was the insane winds the other day that pushed it back like this.

closed #171105

Trash

432 S College AVE

Case Date:
12/3/2019

Trash and debris all over b line side at 432 s college avenue