closed #186167

City Construction Projects

1907 S Sussex DR

Case Date:
11/1/2023

Fiber construction contractors (AEG?) were in our neighborhood (Sycamore Knolls) at the start of October. They've since moved on, but left open holes and piping sticking out the ground all over the place. These were visible, but with the falling leaves they have become numerous trip hazards spread throughout the neighborhood.

closed #186746

Utilities Construction

1913 S Sussex DR

Case Date:
1/11/2024

This is in reference to an issue reported back in November - Case 186167. AEG was in our neighborhood in over three months ago, and left a haphazard trail of pipes sticking out of the ground, holes covered with thin sheets of plywood, and yards torn up and muddy. Can our neighborhood please have some sort of an update as to when they will be back to finish the job they started? Will yards be repaired and reseeded by this coming spring?

closed #187434

Blocked Sidewalk

2405 E Queens WAY

Case Date:
2/26/2024

There is a thorny bush growing into the sidewalk. North east corner of the Montclair & Queens Way intersection. Could it please be trimmed off the sidewalk?

closed #175963

Street Snow Removal

2121 E Wimbleton LN

Case Date:
5/31/2021

So you're doubling the width of the sidewalk from 5ft to 10ft for a recreational path. Great. But does that mean you've also doubled the amount of sidewalk I'm now responsible to clear of snow in the winter? Should I be dumping tea into Lake Monroe?

closed #176265

Potholes, Other Street Repair

2105 E Queens WAY

Case Date:
6/19/2021

Last night (Friday, 19 June), I removed several mats covering drains on Queens Way at High St, just south of Wimbleton on High St, and on Arden near High St. They are part of the Jackson creek Trail Phase II project - but given the immense rain, they were causing dangerous street flooding (several feet high). They will need replacing.

closed #176609

Sidewalk Requests

2103 E Wimbleton LN

Case Date:
7/19/2021

WHEN will Millstone finish this infernal "path" project? My driveway has been gone for well over a month and it's a mess of almost impassable soft gravel and mud. The easement is an eyesore and my wife can't get her car out of our driveway without bottoming out on the street edge. It's been like this since MAY. Who approved this mess???

closed #176840

Other

2205 E Arden DR

Case Date:
8/5/2021

The road/sidewalk construction crew sprayed concrete on my car as I was driving down the street. I assume they were cleaning out the cement truck, but ended up spraying the hose as I drove by splattering my car with cement and rocks. I think it will all wipe off and not harden on the car, but I'm not exactly happy about it or having to clean it up.

closed #177021

Sidewalk & Curb Complaints

2003 S High ST

Case Date:
8/16/2021

It has been 11 weeks since Millstone tore out my driveway and the sidwalk. It is still an awful mess. 3 weeks ago I got a notice from them that they would be replacing my driveway “this week”. It is still a terrible, muddy mess that struggle to drive through. No progress on the driveways anywhere in 6 days. FFS WHEN is this going to be completed? I want my damned driveway back. It’s almost September.

closed #177090

Line of Sight

2115 S High ST

Case Date:
8/22/2021

11 weeks now without a driveway. No driveways completed within 2 blocks in 2 weeks. Am still dealing with mud and gravel for the entire summer. WHEN WILL THIS SANDBAGGED PROJECT BE DONE? 3 city blocks without driveways since memorial day. Hamilton you are dead to me.

closed #177091

Sidewalk & Curb Complaints

2105 E Queens WAY

Case Date:
8/22/2021

FINSISH THIS PRJECT