uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (352)

closed #175185

Line of Sight

702 1/2 N Fairview ST

Case Date:
3/22/2021

Several months ago a vehicle drove into and knocked down a light pole on the opposite corner. Due to that, there have been metal cables coiled up on the corner of 11th and Fairview. Now they have fallen into the right of way of the sidewalk. This is dangerous and I respectfully ask that it be fixed. Thank you.

closed #175240

Sidewalk & Curb Complaints

209 S Dunn ST

Case Date:
3/27/2021

This “historic fieldstone sidewalk” is a TOTAL DISASTER to actually walk on. My teenage son walks, but has limited mobility and requires support to stay upright. This sidewalk was completely unsafe for him to use. We had to cross mid-block on Dunn (also not very safe) to a usable sidewalk on the west side of the street. This may be “historic” but it is NOT ADA compliant. Please make this sidewalk safe for all to use.

closed #175361

Other

Case Date:
4/6/2021

We were told by the crew that created the sidewalk on Sare Road that our hill on that side of our fence would be no-mow foliage or no-mow grass. It is currently as long as the other side of the new sidewalk. It is not safe for us to mow it with only having a zero-turn mower. How can we get it switched to the no-mow foliage we were told would be planted?

closed #175963

Street Snow Removal

2121 E Wimbleton LN

Case Date:
5/31/2021

So you're doubling the width of the sidewalk from 5ft to 10ft for a recreational path. Great. But does that mean you've also doubled the amount of sidewalk I'm now responsible to clear of snow in the winter? Should I be dumping tea into Lake Monroe?

closed #175987

Sidewalk & Curb Complaints

2110 S High ST

Case Date:
6/2/2021

So my driveway and the sidewalk has been completely gone for a month now, without any notice from the city. Progress... It has been replaced with loose gravel, a mess of heavy equipment traffic, and ... nothing for many weeks now. My wife cannot drive her small car over this mess without bottoming out. I haven't been able to drive my motorcycle over this mess because it's too soft for a full touring bike. The contractors spend all their time making an even bigger mess of soft gravel. Mayor Hamilton: when will you make this virue signaling mess a priority? I want my front yard back. I want my driveway back. I want my sidewalk back. FINISH IT SOON.

closed #176234

Blocked Sidewalk

E Short St & S Highland Ave, Bloomington, IN 47401, USA

Case Date:
6/18/2021

New sidewalk is missing a curb cut and thus not ADA compliant

closed #176411

Website & Web Services Feedback

521 W Kirkwood AVE

Case Date:
6/30/2021

There are tall orange cones in front of 521 W. Kirkwood & pink paint marking the lawn & sidewalk. Same set-up across the street. If the city is planning to dig up something--pipes, et, will this affect where the BL Transit can pickup & drop passengers? I catch the bus in front of 521 to go to work. Thanks.

closed #176464

Trails

Case Date:
7/6/2021

I'm very excited to see the new High Street multi path finally being developed, however I do have 2 concerns about the project. First, access for our Sycamore Knolls neighborhood into the Jackson Creek Trail has been effectively cut off during construction, and there is really no safe way to bike to the trail with small children unless you ride on High Street. Better consideration should have been given to maintain pedestrian access after removing the existing sidewalk on High Street. Second, it is disappointing that the trail will end at Arden. It would have been nice to see in continue north for another half mile to Marilyn/Covenanter, and connect into the existing Covenanter Greenway. That would have greatly expanding access for the Southeast side of town towards the B-Line trail utilizing this existing greenway.

closed #176624

Other

Case Date:
7/20/2021

I live at 2206 S Rockport Road in Bloomington. Our mailbox post is on the sidewalk, and needs to be replaced. I plan to hire a contractor to install a new post, which may require digging into the sidewalk to remove the old post and install the new one. Of course the contractor will do a proper patching job on the sidewalk. Do I need any special permission to proceed with this project? Many thanks.

closed #176824

Sidewalk & Curb Complaints

Case Date:
8/4/2021

A citizen called to report a concern and wishes to remain anonymous. According to the caller, for two months there has been no construction on the bike path off of Sare Road. There are still signs saying 'sidewalk closed' as well as 'construction ahead' but it appears that the construction has stopped. Lastly, the Spicewood II sign had been taken down and since put back up but the citizen is disappointed there has been no landscaping done and the limestone around the sign was broken.