uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (343)

closed #176840

Other

2205 E Arden DR

Case Date:
8/5/2021

The road/sidewalk construction crew sprayed concrete on my car as I was driving down the street. I assume they were cleaning out the cement truck, but ended up spraying the hose as I drove by splattering my car with cement and rocks. I think it will all wipe off and not harden on the car, but I'm not exactly happy about it or having to clean it up.

closed #176849

Blocked Sidewalk

Case Date:
8/5/2021

Can a long term project of connecting a walking path between eastern heights and park ridge east be done for kids to walk to University elementary? Much safer than Smith. Good for environment and neighborhood connections. Would be awesome. Please consider a single connecting sidewalk. The neighborhood associations would be happy to help in any way we can.

closed #176956

Sidewalk & Curb Complaints

Case Date:
8/12/2021

High street sidewalk project looks like absolute horseshit. Kids walk through a half complete construction zone everyday with trash, busted up concrete and rusty rebar laying everywhere. This is completely unacceptable. Finish the project!

closed #177088

Sidewalk Requests

Case Date:
8/22/2021

1502 North Lee Street--The sidewalk at this address which borders Emerson is overgrown with weeds. This sidewalk has quite a bit of foot traffic and an occasional wheelchair.

closed #177352

Blocked Sidewalk

High St and Wimbleton Ln (Inbound-Northbound), Bloomington, IN 47401, USA

Case Date:
9/9/2021

Hello! The path for students to walk to/from school is not safe. The crossguard cannot help students cross at High and Greenbriar AND navigate around the closed sidewalk. The gravel/dirt path needs to be completed ASAP so students, parents, staff, and other residents can walk safely. My assumption is that path cannot be complete until the electrical lines in front of 2102 High Street are relocated. If this is the case, please let me know who I can contact about relocating the electrical lines so the path can be paved and this project can be wrapped up. We were told the path would be complete by the start of the school year and are becoming increasingly frustrated with the unsafe environment.

closed #177587

Biking & Walking

1903 S Locust CT

Case Date:
9/23/2021

The sidewalk closed signs have been removed from the new pathway on High Street, yet the new driveways that were poured are several inches higher than the pathway. This is a significant hazard for pedestrians, and bikers.

closed #177781

Debris Removal

1711 S Sycamore CT

Case Date:
10/4/2021

Construction workers from the path project here along Montclair near Southeast Park entrance left lots of debris behind along the sidewalk. They're long gone and didn't attempt to clean any of this up.

closed #177801

Sidewalk & Curb Complaints

425 N Dunn ST

Case Date:
10/6/2021

Heavy, metal sign support with three sandbags has been sitting on the sidewalk for weeks. It blocks wheelchairs and is hazardous at night. Please ask whatever department that left it there to remove it. Thank you.

closed #177829

Potholes, Other Street Repair

2670 S Mccartney LN

Case Date:
10/8/2021

South bound lane,West side of street, going uphill, there is a prominent outward portion of the curbing. It is painted yellow, but now black from repeated contact by vehicle tires. It needs to be rounded off, and move toward the sidewalk. When I struck this prominent angled curb, it resulted in a blowout of my right front tire. The Bland wrecker truck driver said “ Oh, I get lots of business from that curb” so my experience is not unique. Please fix for the nest drivers, and contact me if there are any questions. Thank you!

closed #177915

Blocked Sidewalk

620 S Park AVE

Case Date:
10/18/2021

Parked cars across sidewalk. Often. This weekend, a truck so long you had to walk all the way out in the street.