closed #187434

Blocked Sidewalk

2405 E Queens WAY

Case Date:
2/26/2024

There is a thorny bush growing into the sidewalk. North east corner of the Montclair & Queens Way intersection. Could it please be trimmed off the sidewalk?

closed #187861

Utility Construction Projects

3890 S Claybridge DR

Case Date:
4/2/2024

Two sinkholes have formed, one at the corner of Claybridge Dr and Sare Rd, the other about 30 ft up the sidewalk on Claybridge, after recent neighborhood groundwork that had been done by the contractor for Bloomington Gigabit Now Fiber project. The sinkholes are a hazard to pedestrians and are in need of repair as soon as possible.

closed #173329

Blocked Sidewalk

1369 S Stella DR

Case Date:
8/11/2020

Sidewalk along s Smith overgrown and crumbling where it crosses the small creek/drain 500ft north of e. moores.

closed #173559

Sidewalk & Curb Complaints

2487 S Brittany LN

Case Date:
9/1/2020

The sidewalk contruction on E Winslow Rd has been going on since winter. The project has more says with no one working on it than working on it. today I saw only 4 men on the whole project and none of them were doing any work at 11 AM. Lots of road projects in Bloomington are started and then left abandoned for months. As a resident I don't like this. If they start something they ought to work on it till finished then move on. Im frustrated with the disruption that has been going on for 7 months for a very small project.

closed #173923

Sidewalk Requests

2116 S Susie ST

Case Date:
10/11/2020

There's a precarious dropoff (7-8') into the drainage creek just a few feet away (east) from the sidewalk on RCA Park Drive just north of Countryside, and a few yards into Susie Street. A barrier of some sort to provide added safety would be advisable. Thanks!

closed #173962

Excessive Growth

347 S Maple ST

Case Date:
10/19/2020

Most of sidewalk blocked by shrubs

closed #175963

Street Snow Removal

2121 E Wimbleton LN

Case Date:
5/31/2021

So you're doubling the width of the sidewalk from 5ft to 10ft for a recreational path. Great. But does that mean you've also doubled the amount of sidewalk I'm now responsible to clear of snow in the winter? Should I be dumping tea into Lake Monroe?

closed #175987

Sidewalk & Curb Complaints

2110 S High ST

Case Date:
6/2/2021

So my driveway and the sidewalk has been completely gone for a month now, without any notice from the city. Progress... It has been replaced with loose gravel, a mess of heavy equipment traffic, and ... nothing for many weeks now. My wife cannot drive her small car over this mess without bottoming out. I haven't been able to drive my motorcycle over this mess because it's too soft for a full touring bike. The contractors spend all their time making an even bigger mess of soft gravel. Mayor Hamilton: when will you make this virue signaling mess a priority? I want my front yard back. I want my driveway back. I want my sidewalk back. FINISH IT SOON.

closed #176799

Sidewalk & Curb Complaints

4007 E Stonegate CT

Case Date:
8/2/2021

There are multiple low-hanging trees on the south side of E Hagan Street that make the sidewalk difficult to pass. I believe these are city-maintained trees on the easement.

closed #176840

Other

2205 E Arden DR

Case Date:
8/5/2021

The road/sidewalk construction crew sprayed concrete on my car as I was driving down the street. I assume they were cleaning out the cement truck, but ended up spraying the hose as I drove by splattering my car with cement and rocks. I think it will all wipe off and not harden on the car, but I'm not exactly happy about it or having to clean it up.