uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (1157)

closed #173124

Temporary Signage w/o permit

Bloomington City Hall

Case Date:
7/22/2020

Sign in the grass near the road in front of IHOP on E Third Street: Colins Tree Service

closed #173098

Temporary Signage w/o permit

Bloomington City Hall

Case Date:
7/19/2020

'Music Lessons' sign in the grass in front of CVS near the intersection of E Third and the Bypass; at the roundabout on Moore's Pike; in the grass on Moore's Pike before the intersection with Sare Rd, and several other places all over town.

closed #173096

Traffic Suggestions

North Oolitic Drive

Case Date:
7/19/2020

I have spoken with Public Works and Planning & Transportation previously but i would like to put it out there again since there has been a lot more progress on Union at Crescent. I would like to put in a request that N.Oolitic Dr from the rear exit of Union at Crescent to W.11th St be rebuilt with widening and curb/sidewalk combos to full ROW width. In addition, i still request that the intersection at N.Oolitic and W.11th be turned into a 3-way stop (signs, not lights.) I truly appreciate serious consideration of these matters and I will work with the city in any way I can, within reason, with my adjacent property. Thank you.

closed #173087

Sidewalk & Curb Complaints

3424 S Forrester ST

Case Date:
7/17/2020

This section of sidewalk on the west side of Sare Rd between Rogers and the SOCC parking lot entrance has been missing for years. It impedes mobility for persons with mobility disabilities and could cause a problem for someone with limited sight. I suspect that Vectren removed the sidewalk and didn't replace it. Thanks, John

closed #173083

Blocked Sidewalk

2000 E Wexley RD

Case Date:
7/17/2020

Sidewalk here at the NE corner of High & Winslow is overgrown again, making access to the Jackson Creek Trail difficult for families with strollers, kids on bikes, etc. This has been an ongoing issue for several summers now. Can you please find a permanent resoution to keep this pathway clear and accessible?

closed #173073

Potholes, Other Street Repair

1800 S Henderson ST

Case Date:
7/16/2020

The summer road construction left the northbound lane of S. Henderson gravel with no pavement. This was a fine temporary solution, but the extended length of the lack of pavement has resulted in extremely rough and pitted roadway. Drivers are choosing to drive North in the Southbound lane instead and causing dangerous traffic situations. Can someone expedite either adding more compacted gravel or actually paving this piece of road? It is dangerous to drivers and their vehicles.

closed #173069

City Construction Projects

Miller & Henderson, Bloomington, IN 47401, USA

Case Date:
7/16/2020

For weeks, the contractor doing the concrete curb work at Miller and Henderson has left a deep drop off as you head westbound on Miller to the stop sign unprotected. Of course they have plenty of barrels everywhere else where they filled in the cuts, but not at this the worst one. And every city utility worker coming to and fro from the Miller garage drives right by it.

closed #173030

Temporary Signage w/o permit

3035 N Ramble RD W

Case Date:
7/13/2020

There is a Trump/Pence sign on the city easement at the corner of Ramble Road East and Lakewood Avenue. If I understand the ordinance correctly, it does not have a right to be there.

closed #173029

Line of Sight

2533 E Eastgate LN

Case Date:
7/13/2020

Our tenants are having trouble seeing to the left of the stop sign @ Eastgate LN & SR 46. There's quite a bit of overgrowth on that sidewalk area limiting the visibility.

closed #173020

Traffic Suggestions

1908 S Rogers ST

Case Date:
7/13/2020

Intersection at Chambers Drive and South Rogers is often blocked for vehicles entering or exiting Chambers Drive. Please paint large X or similar pattern on pavement to keep this 3 way intersection clear.