closed #174547
Sidewalk & Curb Complaints
606 E Moss Creek CT
- Case Date:
- 1/20/2021
there have been "end contruction" signs left here for 6 months , construction is long over, can the signs be removed please
there have been "end contruction" signs left here for 6 months , construction is long over, can the signs be removed please
So my driveway and the sidewalk has been completely gone for a month now, without any notice from the city. Progress... It has been replaced with loose gravel, a mess of heavy equipment traffic, and ... nothing for many weeks now. My wife cannot drive her small car over this mess without bottoming out. I haven't been able to drive my motorcycle over this mess because it's too soft for a full touring bike. The contractors spend all their time making an even bigger mess of soft gravel. Mayor Hamilton: when will you make this virue signaling mess a priority? I want my front yard back. I want my driveway back. I want my sidewalk back. FINISH IT SOON.
There are multiple low-hanging trees on the south side of E Hagan Street that make the sidewalk difficult to pass. I believe these are city-maintained trees on the easement.
It has been 11 weeks since Millstone tore out my driveway and the sidwalk. It is still an awful mess. 3 weeks ago I got a notice from them that they would be replacing my driveway “this week”. It is still a terrible, muddy mess that struggle to drive through. No progress on the driveways anywhere in 6 days. FFS WHEN is this going to be completed? I want my damned driveway back. It’s almost September.
FINSISH THIS PRJECT
The part of the curb on the West side of Sare Rd, as showed in the picture, protrudes into the lane unexpectedly and narrows it. As you can see it has black tire marks and the cement is chipped as well – indicating that cars hot the curb all the time. We walk or run there every day and this is an accident waiting to happened. A few days ago, as we were walking along, an SUV hit the curb, right there, and continued to weave for 50 yards. If it had jumped the curb we would have been hit. Generally speaking the walking path is too close to the road and a guard rail should be installed between the Hyde Park Village and at least to Spicewood.
At the Corner of S Clarizz and E Goodnight Way there are new curbs installed so that you can cross the road. There are major apartment complexes on the west side of Clarizz blvd that use this crossing area frequently. As Clarizz Blvd is quite hilly it is extremely dangerous to cross in this area, often you cannot see traffic coming and traffic does not stop as there is not a formal crosswalk here. It would be great if you could install a painted cross walk at minimum for a crossing like this.
There are two signs that were blocking the sidewalk all summer saying that the sidewalk ahead was closed for construction. They never served any useful purpose and the construction has been done for weeks. Someone moved them onto the grass, but they should be taken away because you can still bump your head on them.
While constructing the Bike Path on the portion of E. Arden Drive to SE Park, crews did not remove the heavy mats blocking storm drains at the corners of S. Williams, Greenfield & Sycamore Courts. When heavy rains appear, water flows into E. Arden Drive, oftentimes ponding in low lying areas. People often drive too fast on that street, causing hazardous driving conditions should they loose control of their car.
Northern curb of arch haven Ave where it intersects parallel path along landmark Ave is only raised curb on this path between 3rd st/Bloomfield Ave. This raised curb is dangerous on a bike.