Potholes, Other Street Repair
Kinser Pike and Vaughn Clipp Way Southbound, Bloomington, IN 47404, USA
- Case Date:
- 9/16/2023
Kinser Pike road and sidewalk have been destroyed after the construction and gas line work. Why are you all just letting it be f'd up for so long? These need repaired ASAP before winter so the ice and snow don't exacerbate the already dangerous area. Shame we aren't IU or Eastside a-holes or you all would've had your nodes up our asses day after construction ended
Excessive Growth
Jackson Creek Trail, Bloomington, IN 47401, USA
- Case Date:
- 11/1/2021
2000 E. Rogers Rd at the roundabout island where you can cross the street has high grass that needs to be cut as well as the new sidewalk in this particular area.
Blocked Sidewalk
International Programs, 201 N Indiana Ave, Bloomington, IN 47408, USA
- Case Date:
- 6/24/2024
Limb down on sidewalk and a tiny bit into the street, just west of the intersection of Indiana Ave and 6th St, on the north sidewalk.
Debris Removal (Sand, General Street Debris)
Indiana Ave & 4th St, Bloomington, IN 47405, USA
- Case Date:
- 4/12/2023
Abandoned (3ish days) small Kroger cart of belongings. Overnight the contents have been scattered on the sidewalk.
Parks & Playgrounds
Highland & Winslow, Bloomington, IN 47401, USA
- Case Date:
- 8/1/2020
There is a lot of Poison Ivy growing on the sidewalk on Highland Ave at entrance to the Winslow Sports Complex walking path. It would be nice to have that go away.
Blocked Sidewalk
High St and Wimbleton Ln (Inbound-Northbound), Bloomington, IN 47401, USA
- Case Date:
- 9/9/2021
Hello! The path for students to walk to/from school is not safe. The crossguard cannot help students cross at High and Greenbriar AND navigate around the closed sidewalk. The gravel/dirt path needs to be completed ASAP so students, parents, staff, and other residents can walk safely.
My assumption is that path cannot be complete until the electrical lines in front of 2102 High Street are relocated. If this is the case, please let me know who I can contact about relocating the electrical lines so the path can be paved and this project can be wrapped up.
We were told the path would be complete by the start of the school year and are becoming increasingly frustrated with the unsafe environment.
Excessive Growth
High & Greenbriar OB, Bloomington, IN 47401, USA
- Case Date:
- 8/28/2023
There are quite a few houses that have not cut the grass near the sidewalk and street all along South High St between Wimbleton and Childs Elementary (not just the location cited above). A lot of high grass is actually ragweed, and many people are allergic to this. It would be better for all if the grass and overgrowth were cut.
Sidewalk & Curb Complaints
High & Greenbriar OB, Bloomington, IN 47401, USA
- Case Date:
- 5/20/2022
When will the utility pole support cables be removed from the middle of the sidewalk? Thanks.
City Performance
Henderson St and Wylie Farm Rd at BHS South, Bloomington, IN 47401, USA
- Case Date:
- 7/26/2021
Leaving Winslow Farms today at about 7:10 am and traveling toward Winslow Road, we saw a City pickup truck on the new multi-use path heading toward the high school. There was a jogger who obviously had to get off the path to allow him to pass. The truck was going at a relatively high rate of speed--probably as fast as the street speed limit. The street was not crowded, though it is being ground down and is bumpy. That sidewalk is often very busy--trucks have no business on that path at any time.
Sidewalk Snow Removal
Henderson & Melrose @ Regency Court, Bloomington, IN 47401, USA
- Case Date:
- 2/20/2021
Apartment complex has not shoveled snow in weeks along Henderson.