closed #186235
Street Lights
219 E 7th ST
- Case Date:
- 11/7/2023
Two lights out
Two lights out
The northbound lanes of Rogers St between 6th and 7th have some larger holes that need to be patched when you get a chance. Thanks for all that you do!
If possible, can the paved alley that runs directly behind S Maple Street be plowed? It's the main access road for several homes.
Please kindly consider plowing the alley directly behind the 200 block of South Maple Street when the rounds are made through Prospect Hill. This is a main entry/exit point for several residences.
5th Street between Jefferson and Union streets is beyond the repair of simply fixing pot holes. Some of the damage on the street is due to property owners fixing their sewer lines and then not repaving the street.
E 5th Street needs to be repaved. It is beyond just patching potholes. It is dangerous to walk on because the pavement is broken on both sides of the streets. The city will not prioritize a sidewalk, so pedestrians must share the road with cars and bikes. Please look at the include photo and tell me that it can be repaved!
Tree on north side 5th midway between S. Bryan and S. Jefferson has a broken limb hanging down over the street. It also has several low hanging branches over the road that impede high sided delivery vehicles.
See the picture. Location is 5th st btw Jefferson and Bryan. There is a utility line in that mess as well.
It seems like something has changed with the signal at Third and Smith. If you were on Smith, the light would change soon after you came to a stop especially when there’s little traffic (early morning for example). Now, it takes several minutes for the light to change and allow the Smith Road traffic to go even in light traffic times. This causes Smith Road to be even more backed up than usual. Wanted to see if ot could be set like it used to be. Thanks!
Lots of potholes southbound on S Rogers.