closed #177780
Debris Removal
1904 S Montclair AVE
- Case Date:
- 10/4/2021
Sidewalk at the southwest corner of Queens Way and Montclair is covered in a thick layer of sand and gravel. Can this be swept up please?
Sidewalk at the southwest corner of Queens Way and Montclair is covered in a thick layer of sand and gravel. Can this be swept up please?
Construction workers from the path project here along Montclair near Southeast Park entrance left lots of debris behind along the sidewalk. They're long gone and didn't attempt to clean any of this up.
This tension wire is a hazard for cyclists and needs to be well lit for better visibility in the dark. Reflectors on the wire and along the bend in the path would also add to the safety. I am a 7th grade student at Jackson Creek Middle School. I ride my bike to school every day on the High St recreational path at around 7:30 am. It is dark at that time and I use lights on my bike. On Friday, Nov 5, I was biking down the hill towards this spot. I was going fast down this hill to have enough speed for the uphill right past this spot. Unfortunately, even with my bike light, the tension wire and the sudden bend in the path is hard to see in the dark. My shoulder hit the tension wire and knocked me off my bike. My bike had minor damage to the seat.
Large tree trunk in Jackson Creek. Another big chunk about to go down. Potential issue with flooding.
There has always been speed limit signs across from my house and my neighbor’s house (2 specifically are no longer there). They have been taken down since all the construction of our new 10 ft sidewalks. They need to be replaced! Many people are driving 40-50 miles an hour down our street now! With our new extra wide sidewalks, our street has heavy pedestrian traffic in addition to the school just down the street. It may also be partly because it looks like a very wide open road with the huge sidewalks, people feel they can go as fast as they want. A new flashing speed limit sign may be warranted now that the area has changed. Thank you! Please call me 317-362-8947
So when we have a 5 ft concrete sidewalk WE are responsible to clear it for the kids. As propertty owners. Then the city replaces it with 10 ft of asphalt, assuring us that we are no longer responsible for it. “We will take care of it, Parks and Rec will deal with it in a timely manner”. We get 0.7 inches of snow, the path is icy, and the city is nowhere to be seen. We have to clear the now TEN ft of path ourselves to avoid being sued. FU Hamiltlon! This is is less than an inch!
The Street light across the street keeps going on and off. Probably the bulb needs replacing.
Pothole on the street
Bulldozer came to my back yard and damage my drive way and lawn. I will provide a photo of bull dozer in next post.
Bull dozer came through my drive way and damaged drive way and lawn.