Potholes, Other Street Repair
- Case Date:
- 10/28/2020
At the construction site, there is a sharp drop from the pavement to where they are milling the road. On the other side of the work, there is a sharp edge going back to the regular pavement. I feel that the this situation can damage cars if the driver does not know to slow down. The edges of the construction is not very visible at night. I would like the city to install asphalt transitions from the regular pavement to where the road under construction is being milled. If nothing else, at least put warning signs at the transitions.
Potholes, Other Street Repair
- Case Date:
- 10/29/2020
Two potholes on N Staats drive on the eastside. Please patch as soon as possible.
Thank you
Sidewalk & Curb Complaints
- Case Date:
- 10/29/2020
On Grimes Lane, in the 700 block, between Woodlawn and Henderson, the street is so dirty and full of leaves, other debris, that 3-foot high weeds are growing in the crevice between the curb and sidewalk. It's very unsightly.
Website & Web Services Feedback
- Case Date:
- 11/1/2020
Please post an update on the Vernal Pike/Seventeenth Street project. Seventeenth Street was closed in April 2019 and was to be reopened in November 2019. When will the street be opened?
Sidewalk & Curb Complaints
- Case Date:
- 11/1/2020
At the SW corner of Atwater and Mitchell the newly installed railing has been knocked loose and is sitting in the drainage ditch.
- Case Date:
- 11/2/2020
Intersection of Sare rd and Spicewood Ln. construction crews have repeatedly parked next to the stop sign making it very difficult to see to pull out safely on Sare rd. They also repeatedly have meetings while standing in the road
- Case Date:
- 11/3/2020
546 and 550 park ridge road heavy sidewalk deterioration
- Case Date:
- 11/3/2020
Hello. I'm writing about the East-West Greenway on Bloomington's east side. Biking toward Park Ridge East Park there is a hump and a curve in route. Great biking route but cars are a bit quick. I read there is some new traffic calming initiative? I don't know what that involves but if a Greenway improvement could happen with a bump in those two spots it would be amazing. I appreciated new humps are going into Park Ridge along the same route east of campus and Pete Ellis, so having that all the way through would be a big safety plus for us. Thank you.
- Case Date:
- 11/4/2020
Tried to submit feedback about the UDO. I was unable to. https://survey123.arcgis.com/share/e7af80e158ac4292b6ca439fee4b9e8e
- Case Date:
- 11/4/2020
Several trash bags out by fence that separates property for months and has stray cats and rodents in it.