uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (25)

closed #181002

Utility Construction Projects

3304 E Winston ST

Case Date:
8/12/2022

AT&T left large holes in ground after installing high speed internet.

closed #180579

Utility Construction Projects

3857 S Mill Stone WAY

Case Date:
7/11/2022

2 things: (1) large city tree at SE corner of Sare and Mill Stone Way severely damaged, broken and dangling branches causing hazard for drivers -dangerous, needs immediate attention; (2) damage caused by water main being hit during Smithville contractor work, the same corner is in disarray, lawns torn up, streets are a mess, and city drain affected.

closed #179861

Utility Construction Projects

316 E Cottage Grove AVE

Case Date:
5/14/2022

Att box knocke I Br

closed #179592

Utility Construction Projects

Case Date:
4/21/2022

The electrical poll is damaged and looks to be falling.The poll is on Hillside Drive Bloomington Indiana.

closed #179529

Utility Construction Projects

E Winslow Farm Dr, Bloomington, IN 47401, USA

Case Date:
4/13/2022

Reported by Joanne Freeman to me. Unfinished AT&T fiber project started last summer has left exposed conduit, foot-deep holes and sand fill in rights of way (meaning grass doesn't grow). She wants City inspectors to contact Michael or Sharon Dalton who are the property managers for the subdivision to get this situation addressed. AT&T has been unresponsive to neighborhood contact. Pegasus contact info is (812) 824-3239 and pegasus.properties.gmail.com. They can provide more detailed information.