closed #179830
Street & Traffic Signs
2309 E Arden DR
- Case Date:
- 5/12/2022
Two signs within a inches of each other, one blocking the other. Project has been finished a while I think but this may need attention.
Two signs within a inches of each other, one blocking the other. Project has been finished a while I think but this may need attention.
The tulip poplar planted along the S High St recreational path last autumn is showing no signs of life this spring. All of the other tulip poplars in the area are now fully leafed out. This is the last tree in the row that includes the yellowwoods north of Wimbleton St. Would love for it to be replaced this year. Thanks.
One of the new street trees planted by the city after the completion of the new north extension of the Jackson Creek Trail last fall has unfortunately died, and should be replaced. It is sending up suckers at the base, but I don’t think a large shrubby plant is what was intended. Tree is near the property line of the house on High and the house on the corner facing Wimbleton. Thank you!
So you're doubling the width of the sidewalk from 5ft to 10ft for a recreational path. Great. But does that mean you've also doubled the amount of sidewalk I'm now responsible to clear of snow in the winter? Should I be dumping tea into Lake Monroe?
Last night (Friday, 19 June), I removed several mats covering drains on Queens Way at High St, just south of Wimbleton on High St, and on Arden near High St. They are part of the Jackson creek Trail Phase II project - but given the immense rain, they were causing dangerous street flooding (several feet high). They will need replacing.
WHEN will Millstone finish this infernal "path" project? My driveway has been gone for well over a month and it's a mess of almost impassable soft gravel and mud. The easement is an eyesore and my wife can't get her car out of our driveway without bottoming out on the street edge. It's been like this since MAY. Who approved this mess???
The road/sidewalk construction crew sprayed concrete on my car as I was driving down the street. I assume they were cleaning out the cement truck, but ended up spraying the hose as I drove by splattering my car with cement and rocks. I think it will all wipe off and not harden on the car, but I'm not exactly happy about it or having to clean it up.
It has been 11 weeks since Millstone tore out my driveway and the sidwalk. It is still an awful mess. 3 weeks ago I got a notice from them that they would be replacing my driveway “this week”. It is still a terrible, muddy mess that struggle to drive through. No progress on the driveways anywhere in 6 days. FFS WHEN is this going to be completed? I want my damned driveway back. It’s almost September.
11 weeks now without a driveway. No driveways completed within 2 blocks in 2 weeks. Am still dealing with mud and gravel for the entire summer. WHEN WILL THIS SANDBAGGED PROJECT BE DONE? 3 city blocks without driveways since memorial day. Hamilton you are dead to me.
FINSISH THIS PRJECT