Street Snow Removal
2121 E Wimbleton LN
- Case Date:
- 5/31/2021
So you're doubling the width of the sidewalk from 5ft to 10ft for a recreational path. Great. But does that mean you've also doubled the amount of sidewalk I'm now responsible to clear of snow in the winter? Should I be dumping tea into Lake Monroe?
Sidewalk Requests
2116 S Susie ST
- Case Date:
- 10/11/2020
There's a precarious dropoff (7-8') into the drainage creek just a few feet away (east) from the sidewalk on RCA Park Drive just north of Countryside, and a few yards into Susie Street. A barrier of some sort to provide added safety would be advisable.
Thanks!
Line of Sight
2115 S High ST
- Case Date:
- 8/22/2021
11 weeks now without a driveway. No driveways completed within 2 blocks in 2 weeks. Am still dealing with mud and gravel for the entire summer.
WHEN WILL THIS SANDBAGGED PROJECT BE DONE? 3 city blocks without driveways since memorial day. Hamilton you are dead to me.
Sidewalk & Curb Complaints
2110 S High ST
- Case Date:
- 6/2/2021
So my driveway and the sidewalk has been completely gone for a month now, without any notice from the city. Progress... It has been replaced with loose gravel, a mess of heavy equipment traffic, and ... nothing for many weeks now. My wife cannot drive her small car over this mess without bottoming out. I haven't been able to drive my motorcycle over this mess because it's too soft for a full touring bike. The contractors spend all their time making an even bigger mess of soft gravel. Mayor Hamilton: when will you make this virue signaling mess a priority? I want my front yard back. I want my driveway back. I want my sidewalk back. FINISH IT SOON.
Blocked Sidewalk
2110 E Covenanter DR
- Case Date:
- 8/21/2023
Pickup truck parked on sidewalk, blocking pedestrians; other cars parked on grass in yard.
Traffic Suggestions
2106 E 2nd ST
- Case Date:
- 9/8/2024
I live in the apartment building on the corner of 2nd and High street. The entrance to its parking lot is from High street, very close to the corner. Any time there's a car stopped at the light the entrance is blocked, and the light is delayed for those cars, so unless you are coming in from the south, you have to wait for those cars to go, blocking traffic behind you, or go around the block. Could it be possible to paint the sign in front of the parking lot entrance that cars should not stop there for the light, but a little further from the entrance, and should not block the entrance to the lot? Thank you for consideration!
Potholes, Other Street Repair
2105 E Queens WAY
- Case Date:
- 6/19/2021
Last night (Friday, 19 June), I removed several mats covering drains on Queens Way at High St, just south of Wimbleton on High St, and on Arden near High St. They are part of the Jackson creek Trail Phase II project - but given the immense rain, they were causing dangerous street flooding (several feet high). They will need replacing.
Sidewalk & Curb Complaints
2105 E Queens WAY
- Case Date:
- 8/22/2021
FINSISH THIS PRJECT
Sidewalk & Curb Complaints
2105 E Arden DR
- Case Date:
- 1/15/2022
While constructing the Bike Path on the portion of E. Arden Drive to SE Park, crews did not remove the heavy mats blocking storm drains at the corners of S. Williams, Greenfield & Sycamore Courts. When heavy rains appear, water flows into E. Arden Drive, oftentimes ponding in low lying areas. People often drive too fast on that street, causing hazardous driving conditions should they loose control of their car.
Utility Construction Projects
2104 S Azalea LN
- Case Date:
- 11/7/2022
As you may know, the cable installers are back at work in the Winslow Farms neighborhood (after leaving it uncompleted for well over a year), and they are inflicting significant damage on properties. We came home to find piles of dirt and rock, a new ground box not flush with the ground, and significant damage far up into our lawn from their boring machine--way beyond the utility easement. Further, their work is damaging sidewalks-both cracking the concrete and pushing it up to create tripping hazards. They were rude to our neighbor who confronted them about these issues. Further, they indicated that they were going to trench back between the houses on Azalea, across the conservancy area, to Bayberry. I would like to talk with someone from the city about this excessive damage, how far back onto our property they are allowed to bring their construction equipment before it becomes trespassing, what is an acceptable expectation/timeline for repairs to our lawn, and what sort of plans they may have for trenching back between our houses and across a conservancy area. They posted announcements of their work AFTER they began and a neighbor complained. Please contact me when you can to discuss the ongoing damage this company is doing to our properties and neighborhood.