closed #159806

City Construction Projects

201-251 North Lincoln Street

Case Date:
6/21/2017

Hi, There's a couple of large road cuts at the intersection of Lincoln and 6th St. If the city is not planning on filling these any time soon could we at least get the sharp edges softened? Sometimes I've seen this done and it makes road cuts much easier to drive over without damaging your tires. Thanks, Vickie Nelson Bloomington

closed #160285

City Construction Projects

4021 E Morningside DR

Case Date:
7/25/2017

I just took possession of a home I bought as sidewalk construction on E. Morningside was being completed. The home is at 4021 E. Morningside. It is my understanding the City redid part of the driveway after having to destroy it for sidewalk work. Unfortunately it appears a corner of the drive (front right / SE) is already cracking/chipping/spalling (see photo). I'm requesting the City patch this up before it continues to flake (not huge now but would like addressed so as not to spread) as an area driven over frequently. Otherwise looks fantastic and very happy with the new sidewalk and drive portion. Great neighborhood addition.

closed #151354

City Construction Projects

Indiana University, Bloomington

Case Date:
4/4/2016

Road closed signs are knocked over and are in the southbound lane of Woodlawn.

closed #171300

City Construction Projects

2-54 E Winslow Rd, Bloomington, Indiana, 47401

Case Date:
12/27/2019

Motorists are confused about which lane to be in going westbound on E. Winslow approaching S. Walnut since there is a solid white line dividing the two westbound lanes of the road. I have seen drivers in the right lane turning left onto southbound Walnut.

closed #171454

City Construction Projects

320 W 8th ST

Case Date:
1/15/2020

7th and Union badly needs crosswalk for pedestrian and bike. Thank you!

closed #173069

City Construction Projects

Miller & Henderson, Bloomington, IN 47401, USA

Case Date:
7/16/2020

For weeks, the contractor doing the concrete curb work at Miller and Henderson has left a deep drop off as you head westbound on Miller to the stop sign unprotected. Of course they have plenty of barrels everywhere else where they filled in the cuts, but not at this the worst one. And every city utility worker coming to and fro from the Miller garage drives right by it.

closed #173265

City Construction Projects

Case Date:
8/5/2020

Pot hole on Rogers road by Sherwood oaks church - dangerous! People are damaging their vehicles. Needs immediate action!

closed #179574

City Construction Projects

Case Date:
4/20/2022

The city recently replaced worn some worn curbs and this week repaved a big section of Park Ridge Road in Park Ridge East. The crew did an exceptional job! However, on the east side of the street between the park and Sheffield Drive there is a considerable amount of chunky gravel and dirt left on the sidewalk. Will the city please send someone to clean it up? Thank you so much.

closed #180319

City Construction Projects

Case Date:
6/14/2022

Location, Ticket 180318, NW corner N Park Ridge Rd & E Cambridge Dr. Perhaps others?

closed #180396

City Construction Projects

W 17th St & N Walnut St, Bloomington, IN 47404, USA

Case Date:
6/22/2022

Since cross traffic is not permitted on 17th Street between College and Walnut and east of Walnut, it seems the traffic light signaling through its regular cycle is needless and leading to long backups on Walnut. At least make it flashing yellow.