Biking & Walking
209 S College AVE
- Case Date:
- 2/2/2020
There is a set of two squares of sidewalk that need fixed outside of the atlas at 3rd and college. I fell there and shattered my knee two years ago. I filed with the safety office. It still isn’t fixed. Please do something with it so no one else gets hurt there.
- Case Date:
- 5/4/2018
Hello:
Recently visited Bloomington (IU grads) and noticed the street lights on the B-Line Walking trail. I am involved with our neighborhood association and would like the manufacturer/ supplier info if possible. Appreciate any assistance.
Love B-Town!
Rich Schamerloh
Biking & Walking
B-Line Trl
- Case Date:
- 8/19/2017
I wasn't sure what category to put this in... do city employees know that the B-Line is a pedestrian and bike path? Because a city truck (actual full sized truck, not a parks gator) was just driving north on the b-line (i saw near Dodds). I figured it was a student or freshman parent and was going to stop them and then it ended up being a city vehicle. It was definitely on purpose because she had the opportunity to turn onto Dodds.
Can even our B-Line not be safe from cars?
- Case Date:
- 7/17/2017
In front of Hopscotch along the B-Line Trail at Morton and Dodds. The 4th and 5th bike rack posts down from the north side of the rack are very loose. The 4th one seems like it could be lifted out of the ground. It would be nice and more secure if these could be fixed. The entire rack should be assessed too.
- Case Date:
- 5/10/2017
There's a missing board in the wooden bridge/walkway between Windingbrook and S. High School near Childs School.
Biking & Walking
Bloomington Rail Trail
- Case Date:
- 4/27/2017
There are constantly Kroger shopping carts obstructing the B-Line trail as the trail runs alongside the 2nd street Kroger.
Can Kroger be asked to keep the trail clear? If these carts were in the road they would be taken care of.
- Case Date:
- 1/11/2017
Clear creek trail from church lane to Tapp road in bad shape from high wind. Trash from tree limbs. I was not able to ride bike on Wednesday till I walked trail removing limbs. Still lots of small stuff. Needs cleaning very bad. Thanks
- Case Date:
- 1/10/2017
Good job of snow removal and de-icing on the Allen-Covenanter Greenway and the B-line this winter. Hopefully we can find funding to de-ice all of the side paths around town in future, but this is a good start!
- Case Date:
- 12/12/2016
The city has build the B-Link trail from Henderson to Walnut. But how do I get to Henderson? Are there any plans for a bike/pedestrian trail from Thornton and Huntington to Thornton and and Troy Court. On Google maps, it looks like there is a right of way there. Creating that bike path would extend the unofficial Arden/Thornton greenway to create an east west corridor from Southeast Park to the B-line.
Biking & Walking
Clear Creek Trail
- Case Date:
- 6/18/2016
On the bicycle sidepath bridge, where Tapp Rd goes over Clear Creek, some sheet metal has pealed loose and sticks up. Here is a Google Maps Satellite view showing its location:
https://goo.gl/maps/uyK2Pq3j1h12