uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (22)

closed #181087

City Construction Projects

301 E 20th ST

Case Date:
8/18/2022

Street cuts on E. 20th between N. Dunn and Lincoln are excessive and damaging tires. Please fix before more cars are damaged. Thank you!

closed #179583

City Construction Projects

214 E 15th ST

Case Date:
4/20/2022

Construction site utilizing alleyway creating potholes and divots

closed #178582

City Construction Projects

105 W 4th ST

Case Date:
1/12/2022

Level 1 stairway exit (alley way access) - Standpipe (Fire Dept.) leaking and water is accumulating on landing in front of exit door, may ice as temps fall.

closed #175969

City Construction Projects

417 W Kirkwood AVE

Case Date:
6/1/2021

This is located at the Southeast corner of the parking lot. This is one of several trees needing attention. We would prefer this one to be removed. Also, the broken-off trunk was from a storm damaged tree 2 years ago. Can we get that removed, or at least cut flush to ground level? We are converting these mulch beds to rock beds.

closed #173663

City Construction Projects

507 E Kirkwood AVE

Case Date:
9/10/2020

Bricks surrounding this sewer grate in front of our local business were missing on Sunday 9/6/20. A city staff member who was in his truck next door offered to temporarily remedy it and came back to do so...the brickwork is not finished and needs to be professionally installed, as it's still a hazard to pedestrians. Too much space sits between the bricks and they are not securely in place. Thank you (and JD Boruff) for working on this, and past sidewalk issues along this block of East Kirkwood.

closed #173603

City Construction Projects

1398 W 8th ST

Case Date:
9/5/2020

Huge hole in the road on the corner of 8th and Fountain.

closed #173542

City Construction Projects

2701 E 3rd ST

Case Date:
8/30/2020

Deep, wide pothole(s) in the roadway due north of the CVS Pharmacy, E. 3rd and College Mall Road.

closed #171454

City Construction Projects

320 W 8th ST

Case Date:
1/15/2020

7th and Union badly needs crosswalk for pedestrian and bike. Thank you!

closed #160285

City Construction Projects

4021 E Morningside DR

Case Date:
7/25/2017

I just took possession of a home I bought as sidewalk construction on E. Morningside was being completed. The home is at 4021 E. Morningside. It is my understanding the City redid part of the driveway after having to destroy it for sidewalk work. Unfortunately it appears a corner of the drive (front right / SE) is already cracking/chipping/spalling (see photo). I'm requesting the City patch this up before it continues to flake (not huge now but would like addressed so as not to spread) as an area driven over frequently. Otherwise looks fantastic and very happy with the new sidewalk and drive portion. Great neighborhood addition.

closed #155501

City Construction Projects

427 N Washington ST

Case Date:
9/6/2016

Sidewalk has lifted due to tree roots