City Construction Projects
W TAPP RD
- Case Date:
- 8/20/1997
Noticed that City has blocked off the road through the medical center/COTA which was acting as an alternate route around the Tapp Road work. State is working on 37 exits for Fullerton Pike and Rockport Road and has them down to one lane. This is creating a very dangerous situation since Rockport is the official Tapp Road detour. Someone should look at this and open the road through the medical center or see if something else can be done before someone is killed.
City Construction Projects
1204 S Grant ST
- Case Date:
- 7/30/1997
Citizen objects that Utilities will only repave area torn up for water main installation. Says the work has damaged the whole street and it needs repaving. Says the front of her property has been damaged by storage & removal of gravel, etc. Wants her lawn repaired. Has spoken with Doug Jones who said Mike Farmer would call her. Has also spoken with Dana at Street.
City Construction Projects
429 E Southern DR
- Case Date:
- 7/28/1997
When sewer line was being installed, her property line was taken out, ground bulldozed, fence cut/damaged, and dog houses turned over. She wants Crider & Crider to replace fence. She has called C & C, CBU, Engineering, and Risk. SEE JANE FLEIG and/or JENNIFER LLOYD FOR FURTHER DETAILS.
City Construction Projects
501 E 7th ST
- Case Date:
- 7/14/1997
Trash, concrete, etc., left on sidewalks from remodeling and curb cut. Vehicles are parked on sidewalks.
City Construction Projects
312 N Park Ridge RD
- Case Date:
- 5/12/1997
She called to lodge a complaint about the speed humps that have been installed on Morningside Drive. She lives in Park Ridge east and can't "catch the light" at Smith and 3rd and can't use 10th Street because of the "awful bicycles". She says we have just created "one large driveway " for the people who live on Morningside.
City Construction Projects
1969 S Henderson ST
- Case Date:
- 4/18/1997
ELEANOR BARKLEY CALLED ON 4/18/97. SHE WANTED TO COMPLAINED ABOUT CONSTRUCTION WORK DONE IN THE VICINTY OF HER APTS. AT 2ND & ADAMS. APPARENTLY, A WATER LINE WAS CUT BY THE CREW DOING THE WORK ON 4/15/97. THIS CAUSED MUD BUILDUP IN THE LINES IN HER APTS. MS. BARKLEY HAD TO PAY OUT A CONSIDERABLE AMOUNT OF MONEY TO CLEAN UP THE MESS AND MAKE THE APTS. LIVABLE FOR HER TENANTS. MS. BARKLEY FEELS THAT SHE SHOULD BE REIMBURSED FOR HER EXPENDITURES. SHE DOES NOT KNOW IF CREW WAS COB, CBU, OR PRIVATE.
City Construction Projects
2215 W 3RD ST
- Case Date:
- 6/16/2004
Mr. Potter expressed disapproval and a desire for the West Third Street Phase II project to utilize two way left turn lanes instead of a raised median.
City Construction Projects
1116 S College Mall RD
- Case Date:
- 1/8/2004
Deb McMullen is upset that the city has spent all this money on the College Mall Road project, and the best the city could come up with was restricting only one business, namely Dr. Steeles, to no entry from the south. She says that it looks bad on the department.
City Construction Projects
4037 W STATE ROAD 45
- Case Date:
- 6/19/2003
City Construction Projects
420 E Kirkwood AVE
- Case Date:
- 6/13/2000
Mr. Koontz called T&D and said that his wife was driving on the alleys at 420 E. Kirkwood (behind McDonalds's) and did a lot of damage to her car.