Traffic Related Complaints
- Case Date:
- 8/23/2016
With students returning, I've noticed an uptick in traffic speeding down North Washington between 12th and 10th street. I feel like the problem is only going to increase as the new apartment building at 714 N Walnut is completed.
With several children that play in the neighborhood, I'm concerned with their safety. Can traffic calming measures be investigated for this area?
- Case Date:
- 8/24/2016
823 South Eastside Drive- weeds at the curb where the street comes to it that are over 8 inches high
- Case Date:
- 8/24/2016
1521 Maxwell with the enormous dead tree
- Case Date:
- 8/24/2016
Trash at curb: 618 s. Fess
- Case Date:
- 8/30/2016
Tapp Road And Rockport Road needs to have a signal light . It is overwhelmed as a 4 way stop sighn and creates a huge backup during busy times. Tapp road will need to be a 4 lane hwy soon.
- Case Date:
- 9/8/2016
For HAND:
partially overgrown sidewalks in front of 411 E First Street and
on E First in front of the house at the corner of Washington and First. I could not see the number from the road.
- Case Date:
- 9/10/2016
Large semi trucks turn off
Rogers onto W. 4th. When they get to the cemetery, they can't turn right onto Elm nor go into the cemetery to turn around. There is a sign at the entrance to the cemetery that says no large trucks. It would be helpful if there we a sign at Rogers and 4th. My tree branches are often knocked off and I fear that my car or someone else's will get hit as these large trucks back down the street to where they can turn.
Thank you. Gracia Valliant
- Case Date:
- 9/24/2016
any chance of getting the signals resynchronized on College ave?
Thanks
- Case Date:
- 10/11/2016
Why are so many traffic lights now running 24 hour cycles instead of the yellow flashing late at night? Particularly troublesome lights are on South Walnut by the Herald Times, Henderson and Hillside, Lincoln and 3rd, Washington and 3rd. This switch was made about three weeks ago and is becoming quite annoying.
Potholes, Other Street Repair
- Case Date:
- 10/21/2016
Dear City of Bloomington,
This is not a complaint, rather a thank you. Thank you for completing the Old 37 Curve Correction project so quickly and for doing a great job. I wish that the I-69 project were so efficient.
Sincerely,
Troy Byler