- Case Date:
- 11/30/2015
Sidewalk directly east of/ next to Noodles Restaurant building @ 517 E. Kirkwood is completely dark afer 5:30 pm. Last night, there were people in the tree/shrub area as we walked toward the restaurant, hidden from view. Construction tarp along this sidewalk makes walking along this strip between building potentially dangerous. There is no lighting coming off of the building or the construction site/lot. Suggest some type of lighting from building or IU lot now storing construction materials.
- Case Date:
- 12/7/2015
3rd and Jordan, north bound. The new configuration encourages both north bound lanes to proceed north, which is only one lane wide. The left side light should be left turn only, and that lane should be clearly marked left turn only. I took my granddaughter to lots of Nutcracker rehearsals, and this scared me all the time. Hopefully by next years performance this will be fixed. Otherwise an excellent upgrade to this important intersection.
Sidewalk & Curb Complaints
- Case Date:
- 12/14/2015
fiber optic crews have broken out two large chunks of the new curbs installed a few years back to control water run off. I am concerned that these unseated and cracked curbs will cause further water damage that you just fixed. south of 426 e blue ridge dr. is the location and my address. I think the fiber optic people should be fixing this and not the city needing to come back to fix it again. thanks
- Case Date:
- 1/10/2016
It would be easier and safer to cross the 17th street and Kinser Pike if the traffic light had a WALK SIGN for pedestrians. I think this is important because there are many college students living around this area, and they have to take the bus 6 to go to the campus. Thank you.
- Case Date:
- 1/14/2016
There is a road construction sign sitting to the right of the exit from the plaza (3rd and college mall) between German American bank and HuHot Mongolian Restaurant. This sign is obstructing view when using this exit and is not safe for people pulling out onto busy 3rd street. Please move it.
Traffic Related Complaints
- Case Date:
- 1/15/2016
There is a road construction sign sitting to the right of the exit from the plaza (3rd and college mall) between German American bank and HuHot Mongolian Restaurant. This sign is obstructing view when using this exit and is not safe for people pulling out onto busy 3rd street. Please move it.
- Case Date:
- 1/23/2016
914 E University does not know that they need to clear their sidewalk of snow and I have not been able to catch anyone to tell them. Please let them know about our snow r
Emoval ordinance.
Traffic Related Complaints
- Case Date:
- 2/1/2016
New stop light at Rolling Ridge way had traffic on 2nd street backed up to The Eye Center at 5:10pm. Usually takes around 10 minutes for me to get home it was 20 due to the poor timing of the new light. There was a time around 5:20pm where the light was only green going down 2nd street for a minute before it turned red. Safety concern as well for ambulances trying to get down 2nd street (especially by the co-op where there is cement barriers in the middle of the road). Will be a huge concern when 37 (I-69) 2nd street ramps under construction in a few months.
- Case Date:
- 2/1/2016
New light at intersection of w. 2nd and Twin lakes rec center is too short and causing major delays to the east.
- Case Date:
- 2/2/2016
The new stop light on second street at the Sports Complex is causing traffic to back up in both directions at 8 am and 5 pm. If the light were to be flashing during those heavy traffic times, it would be a tremendous help. I work at the IMA building on Landmark Ave. I couldn't even get out of the parking lot for 10 minutes last evening. It took another 10 minutes to get to the stop light. This is not acceptable. Thank you.