Parks & Playgrounds
3425 E Longview AVE
- Case Date:
- 10/28/2019
Hi,
Regarding Park Ridge Park, as the fall leaf season approaches, I want to bring up leave removal at the park. It does seem as though some bare ground did develop at the park this season and I would say that it is due in part to the lack of leaf removal. Neighborhood residents might be able to aid in getting our very shaded and "treed" park cleared. To make the most of that, we would appreciate it if Parks and Rec or some other city agency could help out with coordinating with the leave removal crews to ensure that if we do gather the leaves that they will be picked up. Is that something that the department can help out with?
Thanks as always,
John
City Construction Projects
Bloomington, Indiana
- Case Date:
- 11/2/2019
Olcott park pathway to Jackson Creek middle school parking lot. When the temperature drops below freezing, this becomes a sheet of ice due to some drainage from the football field flowing down the paved path. Dozens of school children use the path to get to and from school as well as community members. It has been a high slip risk For the last few years as this path does not receive ice removal or salting on a regular basis. Instead of trying to keep up with salting or removing the ice on this long path I hope the city could look into rerouting the source of the drainage to not flow on the pedestrian path.
- Case Date:
- 11/4/2019
Just south of the intersection of Rogers and Coolidge the multi-use path on the west side of Rogers is heavily impeded by overgrowth of a tree. This is dangerous. As part of the B-Line detour, this needs to be trimmed back.
Trails
2304-2398 S Rogers St, Bloomington, Indiana, 47403
- Case Date:
- 11/4/2019
Just north of the His & Her Salon on Rogers the multi-use path on the west side of Rogers is heavily impeded by overgrowth of a tree or bush thing. This is dangerous. As part of the B-Line detour, this needs to be trimmed back.
- Case Date:
- 11/4/2019
Near the power substation on Rogers across the street from Switchyard Park the multi-use path on the west side of Rogers is covered in gravel. The gravel runs the length of the substation north to south and needs to be swept up This is dangerous. As part of the B-Line detour, this should be deemed unacceptable for the City to allow for such unsafe conditions.
- Case Date:
- 11/14/2019
I think the Limestone Greenway is a wonderful addition to our Trails. However, I think it needs at least one trash receptacle. Otherwise, it will get trashed.
Trails
1900-1998 S Rogers St, Bloomington, Indiana, 47403
- Case Date:
- 11/14/2019
The attached photo shows the detour for the B-Line Trail (closed for Switchyard construction) around 11am today. I had to carry my bike across the void. I am concerned that someone with accessibility issues who cannot lift their bike, or is in a wheelchair, would not be able to get by. The sidewalk on the opposite side of the road is closed as well.
This is the west side of Rogers just north of the Rockport intersection. I do not see how this is allowed to happen.
Debris Removal (Sand, General Street Debris)
2258 E Cape Cod DR
- Case Date:
- 11/17/2019
A large pile of leaves has been left covering the pedestrian path in SE Park.
- Case Date:
- 11/20/2019
I am requesting information on city-wide events and classes.
Parks & Playgrounds
Bloomington, Indiana
- Case Date:
- 11/29/2019
Sign not properly planted into the ground at the skatepark. It's barely into the earth with no apparent concrete footer underneath. I don't know if someone fell against it or if it was the insane winds the other day that pushed it back like this.