- Case Date:
- 6/13/2024
We have these nice wide sidewalks in Bloomington to use, however, properties are not being maintained and the overgrowth blocks a large portion of them. Sare Road from Spicewood all the way down to Rhorer road has a lot of overgrowth. I've had my face cut by thorns when I met another runner at the same time and had to run through the brush that was in the sidewalk. The roundabout about at Sare and Winslow down to Jackson creek roundabout is also overgrown. Particularly the bridge area at Jackson Creek. These areas need trimmed down and edging to get full use of the sidewalks. These are heavily traveled paths that are not being maintained.
- Case Date:
- 2/21/2024
northbound bike lane on rogers between 8th st and b line (part of the detour). i found a CBU detour sign partially blocking this bike lane and i carried it down to their construction site at the b line. then i encountered this storm drain, which is at least 3 inches below grade, from poor milling practices when the road was resurfaced last year. these partial obstructions make the bike lane more technically demanding than it should be. not a fair substitute for the all-ages all-abilities b line.
- Case Date:
- 6/4/2024
The sidewalks on Sare Road between Spicewood (as of the morning of 6/4/24) and the roundabout on Winslow have brush that is overgrown to the point that is narrows the sidewalk down so much that only 1 person can walk through. There are also thorn bushes that will scratch you if you meet someone at the same time either walking, running or biking. The sidewalk is also overgrown from the roundabout at the top of the hill on Winslow down to the roundabout at the Jackson Creek trail and then up High Street. These sidewalks are used a lot but the efficiency is greatly diminished since much of it is interrupted by brush. I'm not sure if this is the city's or the property owner's responsibility but it would be great if this could be addressed. Thank you.
Blocked Sidewalk
2225 S High ST
- Case Date:
- 4/19/2024
The multi-use trail on the north side of Rogers road has significant plant overgrowth. At some points, the ten foot path has only four feet of usable width due to the overgrowth. The bushes need to be cut back and the edges of the path need to be cleared. This is on Rogers Rd beginning at the crosswalk roundabout intersection with High St and extending about 350-400 feet east. Thank you!
Blocked Sidewalk
1175 S Smith RD
- Case Date:
- 5/27/2024
Sidewalk here needs resurfacing, it never recovered from at the damage done when the power line poles were put in
Blocked Sidewalk
2394 E Winding Brook CIR
- Case Date:
- 6/5/2024
Path/sidewalk along north side of Rogers (between High and Winding Brook Circle) is substantially overgrown, reducing effective width by almost 50% in places. There is a good amount of poison ivy included.
This is a recurring problem that needs to be permanently addressed. I've reported this issue multiple times over the past couple summers. If this is city's responsibility could it be a regularly scheduled maintenance item?
City Construction Projects
Miller & Highland
- Case Date:
- 4/18/2024
I've lived in this neighborhood for over 20 years, and the city put a hazard sign on the sidewalk months/years ago, but nothing else has been done to correct the problem, which can be quite dangerous at night
Other
1430 Atwater Ave, Bloomington, IN 47401, USA
- Case Date:
- 5/17/2024
There broken sidewalks
Potholes, Other Street Repair
MONROE COUNTY HEALTH SERVICES BUILDING, 119 W 7th St, Bloomington, IN 47404, USA
- Case Date:
- 4/26/2024
Alley on the north side of 112 W 6th Street, Bloomington IN: there is a guardrail installed, the base is utterly deteriorated, very loose to the touch, poses a danger to pedestrians and any vehicular traffic brave enough to use the ease and/or north alley. Needs to be repaired. Thank you.
Sidewalk & Curb Complaints
2661 E 7th ST
- Case Date:
- 3/13/2024
Can the sidewalk at xxx East 7th Street be shaved down to eliminate the height difference between the two adjoining slabs? See photo attached. This height difference can be dangerous for westbound cyclists riding on the sidewalk who need to negotiate both a quick right turn and a left turn to enter the SR46 underpass. Now that an asphalt multi-use path has been built at Relato Bloomington at the intersection of Pete Ellis Drive and Longview Avenue, westbound cyclists are more apt to ride on the path/sidewalk vs. the street, and will continue to ride on the sidewalk all the way to the underpass. Cyclists will be going at speed since it is downhill westbound. To negotiate this sidewalk height disparity, while at the same time negotiating a sweeping turn, poses a dangerous situation that can be easily eliminated.