uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (10175)

closed #201397

Other

Case Date:
3/8/2025

Not sure if this is the right department, but wanted to ask a question about priorities related to sidewalks and streets. I live on Goldin Ct on the east side. Last spring and now this spring, the city is ripping up the sidewalks and repaving them. Hard to argue with that need, but I walk them daily. In my estimation, they were not too bad at all. They do get travel, but not nearly as much as the streets. Goldin Drive and Goldin court are horrible and have been for the last two years. Pot holes, cracks, uneven road. I'm just confused as to why the there has been a two year priority on the SIDEWALKS, rather than the streets which are well traveled by cars and trucks. I'm going to attempt to attach some photos of my street to give you an idea of what I'm talking about. How do these funds get allocated and do you know when the STREET may get some attention?

closed #201356

Potholes, Other Street Repair

Case Date:
3/6/2025

west lane of S Eagleson, south of 2nd St, north of 1st: 2 large rectangular potholes that looked like they might have been temporary repairs. Big bumps when unexpected.

closed #201387

Street Snow Removal

Case Date:
3/7/2025

Snowplow went off the road and left deep ruts in the right away for about 20 yards adjacent to the street (just before the stop sign at Reisner and 3rd). Can this be repaired / resodded?

closed #201185

Sidewalk & Curb Complaints

Case Date:
2/26/2025

Sidewalks in Peppergrass neighborhood, particularly in Pepperidge and Laurel ct. north areas need attentions please! Some of the blocks are really crumbled and become like gravel!! Warm regards,

closed #201448

Potholes, Other Street Repair

Case Date:
3/11/2025

Pothole on E. 3rd St. just past intersection with bypass, westbound right lane

closed #201447

Potholes, Other Street Repair

Case Date:
3/11/2025

Pothole at intersection of Moore's Pike and Smith Road

closed #201404

City Performance

Case Date:
3/9/2025

Pothole repair crews do no heat preparation to existing potholes before filling them with cold patch. They also don't sufficiently pack down the patch. This results in an inadequate bond of cold patch to existing pavement, which leads to rapid failure of cold patch. Some potholes are being re-patched every month and continue to increase in size due to improper repair methods. It would be more effective and less costly to do the patch right the first time.

closed #201549

Potholes, Other Street Repair

Case Date:
3/14/2025

End of cul-de-sac at S. Romans Court, Bloomington, IN 47401

closed #201636

Street & Traffic Signs

Case Date:
3/19/2025

17th cross walk in front of Alumni Hall west bound stop for people in cross walk sign is fade and can't be seen . East bound sign is gone. Can't take of what you got. So you want more?

closed #201637

Street & Traffic Signs

Case Date:
3/19/2025

Indiana Ave stop sign for both lanes 4th & Indiana. Same at Kirkwood. But only on right side at 7th. I was in right lane other night guy in left lane blew through at speed. Could have been bad. If you don't have stop sign who is wrong?