Nuisance Lights
High St & Hillside Dr, Bloomington, IN 47401, USA
- Case Date:
- 11/11/2023
The left turn signal come on for those heading south on high, even when no cars are in the turn lane. North bound High street traffic is then delayed every time. In the morning, it can take 2-3 light cycles to get though because the north bound traffic is delayed in error.
- Case Date:
- 11/10/2023
This light has been reported to Duke at least 3 times for repair. It is on the corner of Countyside Ln and Rockport Rd. It keeps saying it is a working light. There used to be a light here and it is gone. It is very dark in this area. This location is also a pedestrian crossing, a main road to neighborhoods and a city bus pick up location. Please repair this important light!
Street Lights
3320 S Forrester ST
- Case Date:
- 11/10/2023
The street lamp at the intersection of S. Forrester St. and E. Kensington Park Dr. no longer functions.
- Case Date:
- 11/9/2023
From the roundabout on West 17th Street and N. Monroe St. heading west, the first four streetlights are extremely dim, hardly producing any light at all.
Traffic Signals
3297 W 3rd St, Bloomington, IN 47404, USA
- Case Date:
- 11/9/2023
The turn light on eastbound 3rd street going onto N. Gates Dr. stays on even when there are no cars turning.
Traffic Signals
S Patterson Dr & S Fairview St, Bloomington, IN 47403, USA
- Case Date:
- 11/9/2023
The stop light on weekends is messed up. It only stays green for about 6-7 seconds for traffic using Patterson. Changes without anyone even pulling up on either side of Fairview
Potholes, Other Street Repair
- Case Date:
- 11/8/2023
Ummh... weeks ago I reported that the streetlight at Dodds and Fairview is out. It has been for some time. The "stop line" and crosswalk markings south of second on Rogers are also in need of replacement. The time change has come, and these safety measures are needed more than ever.
Potholes, Other Street Repair
3449 E Longview AVE
- Case Date:
- 11/7/2023
Street repaving request for East Longview Ave.
Looking for the 2024 paving schedule, may not be released yet.
East Longview needs paving through its full length within Park Ridge, from N. Glenwood West through to N. Glenwood east cross streets. This would accomplish:
-Repaving needed overall
- Install updated traffic calming bump design replacing current full width bumps.
-Stripe the bike path lane stripe as it's part of the E-W bike greenway.
And thanks! for placing the stop stripes at the 4-way stop E. Longview and N. Glenwood west by the park.
We have a significant issue with motorists running that stop sign by the park entering the neighboorhood. We appreciate your good work.
Street Lights
219 E 7th ST
- Case Date:
- 11/7/2023
Two lights out
- Case Date:
- 11/7/2023
Light between 3204 brennan and 1913 Crimson is out