Website & Web Services Feedback
800-848 E Winslow Rd, Bloomington, Indiana, 47401
- Case Date:
- 5/1/2020
Hello, I am wondering if there are plans to finish the bikepath from Henderson along Winslow all the way up to Highland and the Winslow Sports complex. I live in Sherwood Oaks, and this would make biking to work on campus and biking downtown much safer for me. It would be great if someone from the city could reach out to Sherwood Oaks Neighborhood and let us know up sidewalk and bikepath plans along winslow, henderson and rhorer. I would also like to see a sidewalk all the way from Henderson to Jackson Creek Middle along Rhorer.
Website & Web Services Feedback
521 W Kirkwood AVE
- Case Date:
- 6/30/2021
There are tall orange cones in front of 521 W. Kirkwood & pink paint marking the lawn & sidewalk. Same set-up across the street. If the city is planning to dig up something--pipes, et, will this affect where the BL Transit can pickup & drop passengers? I catch the bus in front of 521 to go to work. Thanks.
Website & Web Services Feedback
Bloomington City Hall
- Case Date:
- 7/31/2020
Hello, I live on Euclid Ave and have to make frequent turns onto W 2nd St. On the corner of these streets, across from the church there are overgrown plants/weeds beyond the sidewalk. It's impossible to see any cars coming from the left while on Euclid Ave. The hill makes it difficult but the plants take any vision left. I've accidentally almost involved myself in accidents due to this. I and I'm sure others would appreciate the obstruction be removed if at all possible.
Website & Web Services Feedback
- Case Date:
- 8/5/2022
I live at 2114 E. Rock Creek Drive, During Fiber installation between the street and sidewalk, the machinary that was used lifted my concrete pad making an uneven unsafe surface. This has not been repaired by the installers of the Fiber. Thanks for your attention to this matter and your response.
Utility Construction Projects
3890 S Claybridge DR
- Case Date:
- 4/2/2024
Two sinkholes have formed, one at the corner of Claybridge Dr and Sare Rd, the other about 30 ft up the sidewalk on Claybridge, after recent neighborhood groundwork that had been done by the contractor for Bloomington Gigabit Now Fiber project. The sinkholes are a hazard to pedestrians and are in need of repair as soon as possible.
Utilities Construction
1607 S Andrew CIR
- Case Date:
- 9/17/2018
Utilities workers were out doing work last year and the hole they dug to work on utilities was never filled in. She reported the hole last year, but it was not resolved. The hole is in the median between the street and the sidewalk. It appears like it is has started collapsing.
Utilities Construction
719 W 7th ST
- Case Date:
- 12/15/2023
They had a water line or sewer line emergency at 719 W 7th and contractors tore up a lot of sidewalk on the South Side of W 7th Street in front of the house. Who is responsible for repair or sidewalk? This happened Thursday night and continued all day Friday 12/15. Contractor was Snedegar Construction.
Trash
535 S Washington ST
- Case Date:
- 7/26/2022
A large 'Envirosac' filled with waste concrete from a sidewalk repair has been sitting for weeks in the tree plot next to the sidewalk at 535 S. Wash. There is also a lot of gravel and other debris still covering the sidewalk in the repair area. It is a safety hazard, as well as making our neighborhood less attractive.
- Case Date:
- 7/6/2021
I'm very excited to see the new High Street multi path finally being developed, however I do have 2 concerns about the project.
First, access for our Sycamore Knolls neighborhood into the Jackson Creek Trail has been effectively cut off during construction, and there is really no safe way to bike to the trail with small children unless you ride on High Street. Better consideration should have been given to maintain pedestrian access after removing the existing sidewalk on High Street.
Second, it is disappointing that the trail will end at Arden. It would have been nice to see in continue north for another half mile to Marilyn/Covenanter, and connect into the existing Covenanter Greenway. That would have greatly expanding access for the Southeast side of town towards the B-Line trail utilizing this existing greenway.
- Case Date:
- 7/17/2017
Eastbound automobile traffic on allen st approaching patterson faces a "no turn on red" sign. However, the right turn curb radius there is more than 30 ft, meaning drivers will not only ignore that sign, they will do so at 20mph on a regular basis! Extremely dangerous and frightening for pedestrians in the area. Practically a guaranteed collision for anyone who bikes on the sidewalk there - is that your plan?