closed #179099
Other
2208 S Fairmount CT
- Case Date:
- 2/27/2022
Bulldozer came to my back yard and damage my drive way and lawn. I will provide a photo of bull dozer in next post.
Bulldozer came to my back yard and damage my drive way and lawn. I will provide a photo of bull dozer in next post.
Bull dozer came through my drive way and damaged drive way and lawn.
Two signs within a inches of each other, one blocking the other. Project has been finished a while I think but this may need attention.
The tulip poplar planted along the S High St recreational path last autumn is showing no signs of life this spring. All of the other tulip poplars in the area are now fully leafed out. This is the last tree in the row that includes the yellowwoods north of Wimbleton St. Would love for it to be replaced this year. Thanks.
One of the new street trees planted by the city after the completion of the new north extension of the Jackson Creek Trail last fall has unfortunately died, and should be replaced. It is sending up suckers at the base, but I don’t think a large shrubby plant is what was intended. Tree is near the property line of the house on High and the house on the corner facing Wimbleton. Thank you!
Fiber construction contractors (AEG?) were in our neighborhood (Sycamore Knolls) at the start of October. They've since moved on, but left open holes and piping sticking out the ground all over the place. These were visible, but with the falling leaves they have become numerous trip hazards spread throughout the neighborhood.
This is in reference to an issue reported back in November - Case 186167. AEG was in our neighborhood in over three months ago, and left a haphazard trail of pipes sticking out of the ground, holes covered with thin sheets of plywood, and yards torn up and muddy. Can our neighborhood please have some sort of an update as to when they will be back to finish the job they started? Will yards be repaired and reseeded by this coming spring?
There is a thorny bush growing into the sidewalk. North east corner of the Montclair & Queens Way intersection. Could it please be trimmed off the sidewalk?
It's been 3 weeks since my neighbor has had a new driveway installed. He still has the sidewalk taped off. It only takes 2 days for the sidewalk to cure, yet the kids are walking on the street or dirty grass because he has the sidewalk taped off for no reason at this point
I assume you're aware of the damage the gas company has done to the asphalt sidewalk in this area (east side of High St by Childs Elementary), and it looks like they are still working. Please make sure that when they repair the sidewalk, they also repair the area immediately north of their work area up to Rock Creek. They have clearly been driving heavy trucks on it and the edges of the sidewalk are cracked and heaving because of it. You can see at the curb ramp at Rock Creek all their tire marks proving they did it and they've broken the concrete there too. Those of us who use this regularly will greatly appreciate a full repair (don't let them just do the obvious area that they removed). Thanks!