Sidewalk & Curb Complaints
2114 E Rock Creek DR
- Case Date:
- 10/15/2022
I had previously filled issue 180907. The contractor has not contacted me regarding repair of the damaged sidewalk due to fiber installation. Could you please urge the contractor to remedy the damage to my cement pad. When they installed the fiber, they lifted the cement pad so it is no longer even with the sidewalk making it a tripping hazard.
Sidewalk & Curb Complaints
2114 E Rock Creek DR
- Case Date:
- 11/1/2022
To Paul Regarding Report #181821. The area is the cement pad between the two trees between the sidewalk and street. The contractors undermined the area under the cement pad and used heavy machinary lifting the cement pad and using heavy machine causing a trip and safety hazard causing an elevation in the cement pad. Attached is a picture. I believe the contractor needs to repair this safety hazard.
City Construction Projects
1907 S Sussex DR
- Case Date:
- 11/1/2023
Fiber construction contractors (AEG?) were in our neighborhood (Sycamore Knolls) at the start of October. They've since moved on, but left open holes and piping sticking out the ground all over the place. These were visible, but with the falling leaves they have become numerous trip hazards spread throughout the neighborhood.
Utilities Construction
1913 S Sussex DR
- Case Date:
- 1/11/2024
This is in reference to an issue reported back in November - Case 186167.
AEG was in our neighborhood in over three months ago, and left a haphazard trail of pipes sticking out of the ground, holes covered with thin sheets of plywood, and yards torn up and muddy. Can our neighborhood please have some sort of an update as to when they will be back to finish the job they started? Will yards be repaired and reseeded by this coming spring?
Blocked Sidewalk
2405 E Queens WAY
- Case Date:
- 2/26/2024
There is a thorny bush growing into the sidewalk. North east corner of the Montclair & Queens Way intersection. Could it please be trimmed off the sidewalk?
Blocked Sidewalk
2214 E Rock Creek DR
- Case Date:
- 5/6/2024
It's been 3 weeks since my neighbor has had a new driveway installed. He still has the sidewalk taped off. It only takes 2 days for the sidewalk to cure, yet the kids are walking on the street or dirty grass because he has the sidewalk taped off for no reason at this point