uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (871)

closed #183420

City Construction Projects

2711 N Dunn ST

Case Date:
4/13/2023

Workers installing optic fiber cable in the neighborhood have left tools, trash, and a 15-20 foot pipe in our yard. We picked scattered stuff up but can't do anything with the tubing and pipe.

closed #171454

City Construction Projects

320 W 8th ST

Case Date:
1/15/2020

7th and Union badly needs crosswalk for pedestrian and bike. Thank you!

closed #160285

City Construction Projects

4021 E Morningside DR

Case Date:
7/25/2017

I just took possession of a home I bought as sidewalk construction on E. Morningside was being completed. The home is at 4021 E. Morningside. It is my understanding the City redid part of the driveway after having to destroy it for sidewalk work. Unfortunately it appears a corner of the drive (front right / SE) is already cracking/chipping/spalling (see photo). I'm requesting the City patch this up before it continues to flake (not huge now but would like addressed so as not to spread) as an area driven over frequently. Otherwise looks fantastic and very happy with the new sidewalk and drive portion. Great neighborhood addition.

closed #187276

City Construction Projects

500 W 7th ST

Case Date:
2/12/2024

Why there detour sign on seventh street

closed #193180

City Construction Projects

401 N Morton ST

Case Date:
8/28/2024

What is happening again on Clarizz street. How much money and time has the city wasted on what ever project this is. Surely we have better uses for our resources. Connie Clark

closed #192921

City Construction Projects

613 E 12th ST

Case Date:
8/18/2024

Prior to the recent construction at this intersection, the storm sewer drains on both sides of Fess just north of 12th Street were covered with thick, fibrous mats, ostensibly to prevent gravel from washing down there during the project. Now that the construction is complete, should those mats now be removed?

closed #193474

City Construction Projects

220 W 14th ST

Case Date:
9/10/2024

Sidewalk closed sign laying in the tree plot. There's no construction going on around here, so I am not sure how or why it's here. Just thought I would let you know in case you are missing one.

closed #148989

City Performance

612 N Washington ST

Case Date:
10/9/2015

Trash all over porch 612 n Washington

closed #172281

City Performance

320 W 8th ST

Case Date:
4/22/2020

I knew Longview and Pete Ellis were getting some apartments built in that lot, but apparently it is going to be more than usually allowed? I am SUPER concerned that you're going to be packing extra students (almost all will have cars) on a road that is NOT designed for heavy traffic but SUPPOSEDLY a bike path for bikes. It might be great, but what are the extra precautions taking place to ensure students zipping in and out won't disrupt the greenway and kill cyclists? Hoping some will be cyclists, but realistically there is going to be a lot of in and out speedy traffic there for what was a very calm road fantastic for biking. Want to make sure it's not overlooked. Also, anything big built east of College is going to experience major backup on rush hour times at College and 3rd. I know it's a state intersection but the city needs to look into it and factor in the ability of that intersection to take on more traffic. Something needs to change there. It literally clogs (outside of a pandemic) constantly with left turn traffic from 3rd turning south to College, which block eastbound 3rd street. Time and again. Part of the problem is it clogs at the next light (the city's I would imagine) by Fazoli's as the lights aren't coordinated well if at all. So two concerns: not a bad place to live, including for students - way better than century village hotel, but make sure the bike path remains safe! This can't be presumed. That area will change big time and cyclists need reassurance. And 2) light at 3rd and College is going to be negatively impacted and timing or something needs to be looked at there. The east/west greenway I was hoping was going to be getting ENHANCEMENTS in the next year or two, not becoming a motorist highway :( Thank you.

closed #173300

City Performance

121 S Smith RD

Case Date:
8/8/2020

Submitted a report but didn't show up in the system? Someone is going to die, likely multiple, if changes aren't made to Smith and 3rd. New 3rd by the State is great but has caused something to change with the Smith traffic. Left turners are hesitating backing up traffic (no big deal) but they are hesitating because cars behind them are zipping around going straight while folks are trying to wait and turn. Meaning the folks can't turn safely, and when they do POW crashes like tonight at 7 pm happen. Please do a traffic study and coordinate with the State for immediate safety improvement. Please do not punt this to the State, but be involved, as Bloomingtonions are going to die; forget traffic, this is about safety. Ideally there needs to be a left turn green arrow only and then a straight signal but that may need lanes. So I don't know the solution, but cars zipping around hitting left turners, etc. is NOT sustainble.