Utility Construction Projects
2104 S Azalea LN
- Case Date:
- 11/7/2022
As you may know, the cable installers are back at work in the Winslow Farms neighborhood (after leaving it uncompleted for well over a year), and they are inflicting significant damage on properties. We came home to find piles of dirt and rock, a new ground box not flush with the ground, and significant damage far up into our lawn from their boring machine--way beyond the utility easement. Further, their work is damaging sidewalks-both cracking the concrete and pushing it up to create tripping hazards. They were rude to our neighbor who confronted them about these issues. Further, they indicated that they were going to trench back between the houses on Azalea, across the conservancy area, to Bayberry. I would like to talk with someone from the city about this excessive damage, how far back onto our property they are allowed to bring their construction equipment before it becomes trespassing, what is an acceptable expectation/timeline for repairs to our lawn, and what sort of plans they may have for trenching back between our houses and across a conservancy area. They posted announcements of their work AFTER they began and a neighbor complained. Please contact me when you can to discuss the ongoing damage this company is doing to our properties and neighborhood.
Sidewalk & Curb Complaints
2105 E Arden DR
- Case Date:
- 1/15/2022
While constructing the Bike Path on the portion of E. Arden Drive to SE Park, crews did not remove the heavy mats blocking storm drains at the corners of S. Williams, Greenfield & Sycamore Courts. When heavy rains appear, water flows into E. Arden Drive, oftentimes ponding in low lying areas. People often drive too fast on that street, causing hazardous driving conditions should they loose control of their car.
Potholes, Other Street Repair
2105 E Queens WAY
- Case Date:
- 6/19/2021
Last night (Friday, 19 June), I removed several mats covering drains on Queens Way at High St, just south of Wimbleton on High St, and on Arden near High St. They are part of the Jackson creek Trail Phase II project - but given the immense rain, they were causing dangerous street flooding (several feet high). They will need replacing.
Sidewalk & Curb Complaints
2105 E Queens WAY
- Case Date:
- 8/22/2021
FINSISH THIS PRJECT
Blocked Sidewalk
2110 E Covenanter DR
- Case Date:
- 8/21/2023
Pickup truck parked on sidewalk, blocking pedestrians; other cars parked on grass in yard.
Sidewalk & Curb Complaints
2110 S High ST
- Case Date:
- 6/2/2021
So my driveway and the sidewalk has been completely gone for a month now, without any notice from the city. Progress... It has been replaced with loose gravel, a mess of heavy equipment traffic, and ... nothing for many weeks now. My wife cannot drive her small car over this mess without bottoming out. I haven't been able to drive my motorcycle over this mess because it's too soft for a full touring bike. The contractors spend all their time making an even bigger mess of soft gravel. Mayor Hamilton: when will you make this virue signaling mess a priority? I want my front yard back. I want my driveway back. I want my sidewalk back. FINISH IT SOON.
Blocked Sidewalk
2110 S High ST
- Case Date:
- 9/3/2021
Millstone has created a massive screwup with their driveways project. The pavement is leading to massive problems with the runoff and also the clearance of driveways onto former basic normal driveways. This whole project is a complete fucskercluck. Is mayor Hamilton's family involved?
Blocked Street
2111 E Queens WAY
- Case Date:
- 12/2/2021
Sussex and queens way - there is a car parked facing the wrong way practically in the intersection. This is an accident waiting to happen.
Sidewalk & Curb Complaints
2114 E Rock Creek DR
- Case Date:
- 10/15/2022
I had previously filled issue 180907. The contractor has not contacted me regarding repair of the damaged sidewalk due to fiber installation. Could you please urge the contractor to remedy the damage to my cement pad. When they installed the fiber, they lifted the cement pad so it is no longer even with the sidewalk making it a tripping hazard.
Sidewalk & Curb Complaints
2114 E Rock Creek DR
- Case Date:
- 11/1/2022
To Paul Regarding Report #181821. The area is the cement pad between the two trees between the sidewalk and street. The contractors undermined the area under the cement pad and used heavy machinary lifting the cement pad and using heavy machine causing a trip and safety hazard causing an elevation in the cement pad. Attached is a picture. I believe the contractor needs to repair this safety hazard.