City Performance
2001 E Viva DR
- Case Date:
- 1/13/2025
The crews that installed the digital fiber in front of my house cut down some small trees, but didn't haul away the branches. The chipper truck came through and picked up tree debris from other yards, but not from mine. Can it still be picked up?
City Performance
417 N Elm St
- Case Date:
- 3/3/2025
The fiber crews were on our street and parked heavy machinery in my parking lot, they punctured a hole in my asphalt and scratched the concrete of my green space.
City Performance
700 S Eastside Drive
- Case Date:
- 4/9/2025
The fiber optic cable pit at 700 S Eastside Drive (right next to the No Parking Any time sign) is missing its (green?) cover, so now there is a big hole in the grass.
I think it was blown off by a recent storm.
City Performance
3811 E Morningside DR
- Case Date:
- 5/14/2025
Crews are there putting in sidewalks they said we never got in notice about this I am the manager for this property. Please give us a detail letter of what will be taking place and the timeline please. This is in front of Yorktown Courts
City Performance
121 S Smith RD
- Case Date:
- 8/8/2020
Submitted a report but didn't show up in the system? Someone is going to die, likely multiple, if changes aren't made to Smith and 3rd. New 3rd by the State is great but has caused something to change with the Smith traffic. Left turners are hesitating backing up traffic (no big deal) but they are hesitating because cars behind them are zipping around going straight while folks are trying to wait and turn. Meaning the folks can't turn safely, and when they do POW crashes like tonight at 7 pm happen. Please do a traffic study and coordinate with the State for immediate safety improvement. Please do not punt this to the State, but be involved, as Bloomingtonions are going to die; forget traffic, this is about safety. Ideally there needs to be a left turn green arrow only and then a straight signal but that may need lanes. So I don't know the solution, but cars zipping around hitting left turners, etc. is NOT sustainble.
City Construction Projects
201-251 North Lincoln Street
- Case Date:
- 6/21/2017
Hi,
There's a couple of large road cuts at the intersection of Lincoln and 6th St. If the city is not planning on filling these any time soon could we at least get the sharp edges softened? Sometimes I've seen this done and it makes road cuts much easier to drive over without damaging your tires.
Thanks,
Vickie Nelson
Bloomington
City Construction Projects
4021 E Morningside DR
- Case Date:
- 7/25/2017
I just took possession of a home I bought as sidewalk construction on E. Morningside was being completed. The home is at 4021 E. Morningside. It is my understanding the City redid part of the driveway after having to destroy it for sidewalk work. Unfortunately it appears a corner of the drive (front right / SE) is already cracking/chipping/spalling (see photo). I'm requesting the City patch this up before it continues to flake (not huge now but would like addressed so as not to spread) as an area driven over frequently. Otherwise looks fantastic and very happy with the new sidewalk and drive portion. Great neighborhood addition.
City Construction Projects
800 East 10th Street
- Case Date:
- 8/3/2018
Please see attached photo. This location is at 10th and Park and has been reported to the IU Grounds Dept. as a tripping hazard. The gray bucket is there to indicate a bus pickup for the Boy Scouts that are in town but the metal and the sandbags are blocking the sidewalk, our crews moved the items off the sidewalk and into the homeowners yard. Please pickup. Thanks Jill.
City Construction Projects
Indiana University, Bloomington
- Case Date:
- 4/4/2016
Road closed signs are knocked over and are in the southbound lane of Woodlawn.
City Construction Projects
- Case Date:
- 7/12/2016
Citizen called, wanted to stay anonymous, reporting dangerous behavior by road crew working on Old 46. Drove toward her in her lane, head-on.