Request a new Street Light
2800 W Arlington RD
- Case Date:
- 12/8/2022
in the morning and in the afternoon when school is starting/ending one can spend more than 10 minutes making a left turn here. Today I had one car ahead of me attempting this who eventually turned right after 11 minutes, while at least 5 school buses trying to get to Tri-North and a large number of cards piled up behind me. A stop sign or a light that is programed for school hours would make it a lot easier and help keep everyone arrive on time. An additional challenge is that you have a lot of new drivers (HS) who don't always use their turn signals or don't know to stop before turning on to Prow Rd and allow for taking turns.
- Case Date:
- 7/24/2024
This is an Envirosac of cement (concrete construction debris), likely left over from fiber optic installation one year ago. It is at the residence of 2809 E Daniel Street. It was a box of powdered cement, that naturally hardened into concrete, making it VERY heavy. I would like to know who to contact to remove this from the easement? Another neighbor asked the residents to please remove it, however they have not, and they likely do not think it is their place to do so since the fiber optic company fractured their driveway and did not take this box of cement with them when they repaired it.
Can you please point me in the right direction. Photos included. Thank you!
Blocked Sidewalk
2801 E Daniel ST
- Case Date:
- 9/9/2025
N/S running sidewalk on the east side of S Sare Rd is very overgrown, including poison ivy patches. This is a City-maintained path. Would be cool for it to be cut back!
City Construction Projects
2801 E David DR
- Case Date:
- 12/17/2024
Metal sign near David & Sare leftover from project near Hyde park
Traffic Related Complaints
2801 N Walnut St Suite 1
- Case Date:
- 8/6/2025
I cannot fathom why, every year, Bloomington literally decides to wait until the very first day of school to start a construction project on any main road leading to a school. Does that sound smart to you?? To ensure that all major roads leading to schools are down to one lane on the first day, almost certainly causing not only students to run late but parents late to work and likely more accidents??? Does that sound smart to yall?? It must because we’ve got construction on 10/bipass, bethel, and N walnut. Do. Better.
Traffic Suggestions
2801 S Rogers ST
- Case Date:
- 9/19/2024
Dedicated right turn lane at Country Club and Roger’s intersection for people heading eastbound
Utility Construction Projects
2807 S Elizabeth CT
- Case Date:
- 3/25/2023
Gas? Workers dug up multiple parts of my lawn and driveway. This was two weeks ago. They said they were going to come back and fix everything but obviously that hasn’t happened. In the dirt is ground pieces of the old driveway including baseball sized chunks. We are also selling the house so this is hiring our home value - no one wants to buy a house with a broken chunk of driveway.
Excessive Growth
2809 S Somerset CT
- Case Date:
- 6/21/2023
Plants and trees overhang much of the sidewalk on the west side of S. Sare Rd. between Buttonwood and Rogers. The sidewalk is passable but more than half of it is blocked throughout parts of this path. Thank you!
Blocked Sidewalk
2810 S Walnut Street PIKE
- Case Date:
- 5/25/2023
Sidewalk is blocked by untrimmed bushes just outside K Luke Eades Family Dentistry
Line of Sight
2821 S Rayle PL
- Case Date:
- 1/2/2024
Not sure if this is formally in the City or not and if HAND has jurisdiction here, but this property has a very tall fence surrounding the property that comes right up to the intersection of Rayle and Fairington. It is so tall and so close to the intersection that a driver cannot see traffic coming around the corner. It is unsightly and, more importantly, dangerous.