open #212247
Excessive Growth
1214 W Cottage Grove AVE
- Case Date:
- 7/9/2026
Report #211965 continued issue, plants are growing further into sidewalk as of 11pm July 8th. It's on the backside of this address on N Adams
Report #211965 continued issue, plants are growing further into sidewalk as of 11pm July 8th. It's on the backside of this address on N Adams
Home has sat empty all summer yard overgrown front sidewalk partially blocked. Yard has only been moan once all summer. Maple St side of house very overgrown along backyard fence
There are 2 trees here falling across the sidewalk. The owner needs to take care of it before they fall and hurt someone. They are along the sidewalk that runs parallel with Kinser.
Overgrown plants and a lot of sticks yard waste on the ground, making sidewalk narrow and not accessible. I don't know if this is city property or residential since it's so close to the bridge.
7th ST ROW on south side need maintenance at both addresses. 134 N Roosevelt St AND 135 N. Clark St.
Out of town landlord needs to do yard maintenance. Not asking city or HAND to do it. Please bring your considerable resources to bear upon the owner to fix this area once and for all.
Pothole
Couple weeks ago, some contractor dug up 7~9 holes on kinser pk between rosewood and acuff rd. I think they were installing natural gas pipe. They buried it and filled it with concrete but never finished it with asphalt on top as concrete wasn't filled all the way to the top. (The white patches in the picture) It's very bumpy when you drive over it. I am concerned with two points, 1. They just paved Kinser Pk not long ago and this is going to deteriate the road that city just re-paved if they don't fix it soon. 2. People are resorting to driving on the other side of the road to avoid the holes, including school buses. This is not a safe situation. Again, I would have thought they would come back and finished it quickly but it's been many weeks and I am starting to be concerned. Thanks.
The repairs on the street cuts near Walker st and west 2nd are very poorly done. No excuse for drivers having to slow to 10 miles per hour to go through these multiple street cuts, to avoid damaging their vehicle.
All of the new construction along Jefferson between third Street and 10th St. where they’ve made street cuts for the sewer lines need to be repaired. I believe it’s the responsibility of the contractor to repair the street and none of these repairs look to be permanent.