City Construction Projects
1204 S Grant ST
- Case Date:
- 7/30/1997
Citizen objects that Utilities will only repave area torn up for water main installation. Says the work has damaged the whole street and it needs repaving. Says the front of her property has been damaged by storage & removal of gravel, etc. Wants her lawn repaired. Has spoken with Doug Jones who said Mike Farmer would call her. Has also spoken with Dana at Street.
City Construction Projects
1204 S Grant ST
- Case Date:
- 7/30/1997
Citizen objects that Utilities will only repave area torn up for water main installation. Says the work has damaged the whole street and it needs repaving. Says the front of her property has been damaged by storage & removal of gravel, etc. Wants her lawn repaired. Has spoken with Doug Jones who said Mike Farmer would call her. Has also spoken with Dana at Street.
Water Quality
910 S Grant ST
- Case Date:
- 8/8/1997
DIRTY WATER
Water Quality
423 E Dodds ST
- Case Date:
- 9/1/1997
WATER MAIN BREAK AT DODDS AND WYLIE
Water Quality
421 E Allen ST
- Case Date:
- 9/25/1997
LOW WATER PRESSURE
Sidewalk Snow Removal
1101 S Henderson ST
- Case Date:
- 10/29/1997
Ms. Fixton want the drainage ditch in bryany Park at henderson cleaned out. Clains that storm water is backing up and flooding her basement.
Sidewalk Snow Removal
624 S Washington ST
- Case Date:
- 11/21/1997
MR FISH HAS A DRAINAGE PROBLEM WITH WATER RUNOFF FROM THE ALLEYWAY NEAR HIS HOME. THE WATER GOES ONTO THE CONCRETE SLAB INTO MR. FISH BASEMENT. (NOTE: I DID NOT TALK WITH FISH, THE COMPLAINT WAS TAKEN IN BY DEB VOLLMER)
Other
604 S Washington ST
- Case Date:
- 12/1/1997
NOISE AND VIBRATING IN WATER LINE
Water Quality
1307 1/2 S Walnut ST
- Case Date:
- 1/24/1998
NO WATER
Water Utility Problems
1000 S Palmer AVE
- Case Date:
- 2/7/1998
WATER MAIN BREAK AFTER HOURS CALL TO CONTROL