open #212257
Potholes, Other Street Repair
1163 S Fenbrook LN
- Case Date:
- 7/10/2026
deep pothole and rough area
deep pothole and rough area
I'd like to recommend a left turn arrow signal at 3rd and Washingtonbe added. When turning left onto Washington, headed west, there are long waits and backups. Buses, police vehicles, and more vehicles turn there to take Washington St. south and new traffic from the convention center will compound this problem. Hoping you'll consider adding this to the current traffic light.
Continued issue with cars parked across sidewalk in front of BHA office. Car currently parked there 9:45pm with an entire car length ability to pull forward and off the sidewalk.
Water is turned off at this location without notice
citizen angry, did not leave name, next door neighbor keeps pushing trash from thir yyard unto her neighbor's driveway.
trash and receptacle in front of neighbor's yard
The sidewalk connecting the multi-use path along the 1700 block of E. Winslow Rd to E. Caradon Hill is an important accessibility and transportation link for the neighborhood. It is the only practical route for bicycles, scooters, wheelchairs, strollers, and other wheeled users traveling east from Winslow to connect with the northbound multi-use path along High Street near Childs Elementary, as the sidewalk on the south side of Winslow ends in a series of steps. I use this connection several times each week while transporting my 4-year-old to daycare by cargo bike. Currently, foliage is encroaching on the southern portion of the sidewalk, narrowing the usable path, and several sidewalk sections are uneven with significant elevation differences between panels. These conditions make the route difficult and potentially unsafe to navigate. I would appreciate any maintenance and repair efforts to restore this important community connection and improve accessibility for all users. Thank you!
There has been excessive growth of old tires at 828 W Wylie. They are a prime breeding ground for mosquitoes and the health hazards they spread. Please help the west side by doing what you can to get them to clean this mess up.
Hi - is there any chance of getting ramps and crosswalk to join these two multiuse paths? I bike these two paths all the time (coming and going from northwest of this point) and would really like to cross here rather than other places.
For over a week now there has been a utility cut on E First at the intersection with S Mitchell. No warning sign or anything. When will it be surfaced?