City Construction Projects
1005 S Covenanter DR
- Case Date:
- 8/11/2020
The drainage easement at the south end of Greenwood Dr., where it dead ends into the sidewalk, is blocked with a landslide of debris. The water level rose to 3 feet on either side of the sidewalk and covered three properties adjacent to the clogged drain with water and debris. Thank you for your help. Jim and Debbie Quinn
Sewer Problems (Storm Sewers)
1000 S High ST
- Case Date:
- 4/1/2016
I have traveled High Street between Arden Rd. and 3rd Street twice a day for the last ten years. Every time there is a heavy rain, water accumulates and flows down High Street between E. Mores Pike and 2nd St. forcing me to move to the other lane to avoid going through large amounts of water creating a very unsafe situation. I was delighted to see this section of High Street repaved last summer and noticed the sewers also being worked on. I assumed, incorrectly, that the runoff problem would be corrected during this maintenance project. Since the paving the runoff has actually gotten worse. Are there plans to fix this unsafe situation so cars can travel safely on High Street without endangering drivers and pedestrians? I regularly see in the Herald Times where is city is allocating and spending money on hiking and biking trails, sidewalks and various pedestrian conveniences. Why don’t we spend some of that money on making our streets safe and passable?
Looking forward to your reply,
Franklin Lograsso
Bloomington
cc: David Rollo