closed #137352
Other
2003 S High ST
- Case Date:
- 4/16/2014
It has been 11 weeks since Millstone tore out my driveway and the sidwalk. It is still an awful mess. 3 weeks ago I got a notice from them that they would be replacing my driveway “this week”. It is still a terrible, muddy mess that struggle to drive through. No progress on the driveways anywhere in 6 days. FFS WHEN is this going to be completed? I want my damned driveway back. It’s almost September.
Multiple growing potholes on east side of S High St between Wimbleton and Queensway.
We're moving to B'ton in July on S. High St. Our moving van will need to block S. High for 4-5 hours on a weekday; do we need a permit to have the truck block a bus route, and what is the cost if yes?
Tree trimming occurred along High Street a few weeks ago. Some of the debris was removed by the company contracted to do the trimming but much more was left behind. Will further clean-up be done?
My water consumption use (and corresponding bill) is twice as much as any of my other previous months. We have not increased our usage during March - if anything, it should be a little less since we were out of town for a week. This reading cannot be accurate.
Trash truck picked up our can today, but it was so fast the can didn't empty. Can you can back out and get it? 2006 S Sussex. Thanks!
Tree came down last night leaving debris all in the road. 2003 S Sussex or so.
The roadway has been built up quite a bit in front of our house at 2006 S Sussex, resulting in a significant dip between the street and our driveway. This is causing the bottom of the cars to scrape when entering and exiting. Surrounding houses have had blacktop poured into this area to level out the connection. Could we have that done too please?