closed #177089
City Construction Projects
High & Wimbleton, Bloomington, IN 47401, USA
- Case Date:
- 8/22/2021
Neglected projectes
Neglected projectes
11 weeks now without a driveway. No driveways completed within 2 blocks in 2 weeks. Am still dealing with mud and gravel for the entire summer. WHEN WILL THIS SANDBAGGED PROJECT BE DONE? 3 city blocks without driveways since memorial day. Hamilton you are dead to me.
FINSISH THIS PRJECT
Light out
street light is out in front of our house which makes the end of the lane very dark
The crossing lights for bikes and pedestrians are not working. I first noticed this in the morning of Thursday, August 19th. They were also not working this morning, Monday, August 23rd, around 8:50 and again around 9:10. To be more specific, when crossing west to east I could not tell if the lights were on because there is no visual or auditory indication after pressing the button. The only way I would be able to know is to walk to the north to face the lights. When crossing east to west, there is one bank of lights on the pole above the button. After pressing the button multiple times the lights did not come on. This is a distressing crossing when the lights are working. We use it daily during school when biking our child to school, maximum four times a day, five days a week. The crossing is extra distressing when the lights are not working and we have no way to tell when there are on when making the crossing west to east.
Yard overgrown. Has called for over six weeks and nothing appears to be done.
new tenants moved in, leaving cans at curb for days, trash in yard, torn open and scattered, trash carted to sidewalk, not in bins
yard overgrown especially at back of property, vines around house, overgrown in back
Traffic slowing curb cuts installed on Allen are filled with weeds. Walking by them forces you out into the street and visibility is hampered by the weeds