Traffic Related Complaints
- Case Date:
- 4/19/2022
I was walking towards Winslow Sports Complex along Rock Creek Drive (heading west) when I saw a person drive his car on the multi-use path (between the houses) into the park. He turned right on the path and drove to the YMCA parking lot.
Scooters, Bike-share and Related Issues
- Case Date:
- 4/20/2022
Follow-up Case #179422. "Good afternoon, sorry for the delay in response, I was unsure of who to send this type of case. Forwarding to Parking Services thank you"
Two comments: 1) after several years and lots of scooter complaints (media, uReport, etc.) it's strange that it wasn't routine where to refer it
2) maybe that explains why not a single ticket has been for improperly parked scooters. Anyhow, I suggest that routine monitoring of sidewalks (downtown at least) be assigned to Parking Enforcement
City Construction Projects
- Case Date:
- 4/20/2022
The city recently replaced worn some worn curbs and this week repaved a big section of Park Ridge Road in Park Ridge East. The crew did an exceptional job! However, on the east side of the street between the park and Sheffield Drive there is a considerable amount of chunky gravel and dirt left on the sidewalk. Will the city please send someone to clean it up? Thank you so much.
Potholes, Other Street Repair
- Case Date:
- 4/20/2022
Pothole in south bound lane across from Bloomington Hardware
- Case Date:
- 4/20/2022
THE ISSUE: On the left, looking west toward the basketball courts in Bryan Park. Over the years attempts have been made to deal with erosion caused by the stream that flows into Sheridan Creek.
A SUGGESTION: Erect a lttle bridge for pedestrian like the one illustrated on the right (on Highland between Southdowns and the pedestrian / bicycle link to Weatherstone in Deer Park over a drainage ditch.
Potholes, Other Street Repair
- Case Date:
- 4/20/2022
Hit water shut off in street and busted a tire.Would like to get it fixed.
Potholes, Other Street Repair
- Case Date:
- 4/20/2022
On E Second Street:
coming from the intersection with High Street, parallel to the pedestrian bridge, several holes have reappeared again in the middle of the street.
Continuing on E Second at the intersection with Arbutus, pothole; continuing towards Eastside Drive, after the intersection several holes on E Second.
Continuing towards downtown, between Park and Woodlawn is a manhole cover that is missing part of the pavement that used to be around it.
- Case Date:
- 4/20/2022
it seems that the STOP sign has been removed at the exit from Luella's Chicken, heading towards Target, or turning right to go around the corner towards Fresh Thyme.
- Case Date:
- 4/21/2022
Water leak in city water line pre meter
- Case Date:
- 4/21/2022
Water leak from main city water line pre meter located at 820 W Country Club Dr, Bloomington, IN 47403
Connection from the city water Line does not have a strong seal and is spraying water, affecting water pressure.