closed #174102
Biking & Walking
- Case Date:
- 11/10/2020
With it getting dark earlier I have extra concerns with traffic speed in my neighborhood now while walking. Please prioritize residential traffic calming. Thank you.
With it getting dark earlier I have extra concerns with traffic speed in my neighborhood now while walking. Please prioritize residential traffic calming. Thank you.
Hello. I'm writing about the East-West Greenway on Bloomington's east side. Biking toward Park Ridge East Park there is a hump and a curve in route. Great biking route but cars are a bit quick. I read there is some new traffic calming initiative? I don't know what that involves but if a Greenway improvement could happen with a bump in those two spots it would be amazing. I appreciated new humps are going into Park Ridge along the same route east of campus and Pete Ellis, so having that all the way through would be a big safety plus for us. Thank you.
Street light along Madison between 3rd and 4th is flickering and has been for the past week
Please be aware that there is no bike/side path on College Mall from Moores Pike to 1116 S College Mall rd. as shown on the bike map produced(?)/provided by the city. Some of this could have been addressed with the new intersection layout at Moores Pike & Sare Rd/College Mall Rd. Yes, there still would have been a gap but minor compared to now and perhaps save future reconstruction of part of intersection.
The light at the Olson Elementary crosswalk is turning red about every 60 seconds even when there are no pedestrians. It seems like it needs to be reset. Usually it only turns red when someone pushes the crosswalk button.
Missing bike route sign?
A bike is very much needed in front of or near The Book Corner. There’s nothing available on this end of the block forcing people to lock to streets signs.
There is not continuous sidewalk on Adams from Allen to 2nd street causing pedestrians to have to walk in the road in an unprotected area. On the East side of the road it literally ends in a wooded area and people have made a foot path from the end of the sidewalk, through the woods, to the road. On the West side of the road the sidewalk goes from 2nd south about a half a block and then just ends. This needs to taken care of by the city.
I don't know if the city government was involved or not but thank you if so if involved with the sidewalk replacement at Eastplex. Awesome!
The pedestrian crossing sign in the middle of the road is missing.