closed #181765

City Construction Projects

1004 W 1st ST

Case Date:
10/10/2022

The contractor that did the construction in the basement did it without permits, it also violates the fire code. This facility treats disabled individuals struggling with mental health and addiction.

closed #182597

City Construction Projects

728 W Allen ST

Case Date:
1/24/2023

Intersection of Patterson and Allen. If heading north on Patterson, there is a hump as you cross Allen street at the light. When doing 30mph(the speed limit) it's enough to upset steering and cause traction control to come on.

closed #182644

City Construction Projects

323 1/2 S Lincoln ST

Case Date:
1/27/2023

The signs giving instructions for the back-in parking should have the diagram (map) rotated 180 degrees. The standard for such diagrams is to have the direction of movement going UP the page, not down. Also, the parking spaces are shown on the right side of the diagram; it looks like you are instructed to front into spaces on the right (the small arrows pointing down are hard to notice, while the up-&-right arrow is large).

closed #183101

City Construction Projects

1521 S Arbors LN

Case Date:
3/12/2023

Moors and Clarizz, the fiber contractors left a large rectangular hole in the asphalt by the arbors entrance

closed #183345

City Construction Projects

323 S Grant ST

Case Date:
4/5/2023

There was a temporary traffic sign placed in front of the property. The street construction is complete, but the sign was never removed. The sign was blown over by the wind and has become an eye sore. It would be great if the city could get that picked up...

closed #171172

City Construction Projects

301 E Winslow RD

Case Date:
12/9/2019

The sidewalk widening project along S. Henderson St. is extremely dangerous for pedestrians and a hazard for vehicles pulling in and out of Winslow Plaza as well. The contractor dug 2' deep x 2' footings for new curbs at the sidewalks crossing the entrances to Winslow Plaza and put up now warning signs, barricades, cones, or caution tape. No sidewalk closed signs have been put up. Who is supervising this project?

closed #172047

City Construction Projects

2208 E Arden DR

Case Date:
3/22/2020

Hello -- this cover has a hole in it and that seems dangerous.

closed #172108

City Construction Projects

1525 E Bradshire ST

Case Date:
3/29/2020

Loose wire on power line.

closed #172545

City Construction Projects

3812 S Laura WAY

Case Date:
5/23/2020

S Laura Way is on a signed, much used bicycle route. Going north from S Jamie Ln it goes downhill for 0.2 miles. A bicycle going down this hill will reach a high speed at the bottom where there is a deep pothole. This road hazard could easily damage a bicycle or flip it over. It is located at 3813 S Laura Way. This pothole should be repaired.

closed #173337

City Construction Projects

1005 S Covenanter DR

Case Date:
8/11/2020

The drainage easement at the south end of Greenwood Dr., where it dead ends into the sidewalk, is blocked with a landslide of debris. The water level rose to 3 feet on either side of the sidewalk and covered three properties adjacent to the clogged drain with water and debris. Thank you for your help. Jim and Debbie Quinn