closed #156234

Utilities Yardwork

3876 E Regents CIR

Case Date:
9/27/2016

Yard work was done at this location, and the customer would like more top soil for his yard.

closed #153577

Utilities Yardwork

510 S Woodlawn AVE

Case Date:
6/16/2016

Drunken college students (I bet you wish you had a dollar for every time one of these started that way) pulled a pipe out of the ground from down the block and threw it in my yard during little 5. I know where they pulled it from since I used to pass it on my way to work. It is vertical and has orange spray paint on it and I'm assuming it was used to mark water lines or other utility info under ground.

closed #137155

Utilities Yardwork

2417 S Rogers ST

Case Date:
4/8/2014

Customer is requesting that yard work be done due to City project.

closed #135051

Utilities Yardwork

503 S Ballantine RD

Case Date:
10/31/2013

Customer wants yard work done after meter pit repaired.

closed #206945

Utility Construction Projects

808 S Whitley DR

Case Date:
11/25/2025

We have a gigabit line install over the city sidewalk, easement. Installed by axis solutions Nov 25th. This is a heavily used sidewalk near mailboxes and we have two blind residents that use this pathway. There is a hello flag but no safety ramp, cones or other alerts that might deter a blind person. It's not a well lit area and is a tripping hazard. Please call at your earliest convenience, 812.650.8740 to offer solutions.

closed #214554

Utility Construction Projects

301 W 2nd ST

Case Date:
9/28/2026

Follow up to uReport #214330, 214331, 214332: Foam squares have been put into place, but they are not accessible due to large gaps between them.

closed #214332

Utility Construction Projects

301 W 2nd ST

Case Date:
9/21/2026

Additional photo for uReport #214330

closed #214331

Utility Construction Projects

301 W 2nd ST

Case Date:
9/21/2026

Additional photo for uReport #214330

closed #214330

Utility Construction Projects

301 W 2nd ST

Case Date:
9/21/2026

Detour around closed section of B-Line Trail is not accessible. Following the detour leads pedestrians across a broken tactile curb ramp, across road covered in gravel. The makeshift ramp on the Hopewell side of the street was not able to be climbed by my wheelchair. I couldn't go West around it down 2nd Street on the north sidewalk because it's blocked by stones in the sidewalk. Couldn't go West around it on the south sidewalk because the sidewalk is blocked. Couldn't go East on the north sidewalk because the Seminary Park building has a big drop-off on the sidewalk. I had to ultimately use the Wendy's/Kroger parking lot to get where I needed to go. I'm quite frustrated that detour accessibility is not being planned ahead of time, before a detour is put into place

closed #213155

Utility Construction Projects

813 W Graham DR

Case Date:
8/17/2026

CBU recently replaced a pipe at Broadview and Graham. They filled in the hole and topped it , but now the repair is sinking below road depth and seems to be getting a bit deeper daily. It's becoming a traffic hazard.