Potholes, Other Street Repair
- Case Date:
- 10/19/2021
On the north side of the newly-paved 7th Street, between Dunn and College Avenues, there are numerous locations where sewer and water drain covers are sinking into the ground...it is excessively bumpy, hazardous and only going to get worse unless addressed immediately.
- Case Date:
- 10/20/2021
Property isn't being maintained. Please note - it is not the homeowner's responsibility to maintain the common property - it is the responsibility of the Winslow Farm Community Association. All areas around the ponds are overgrown and represent a hazard. The area next to 612 E Winslow Farm Dr. is overgrown (picture above) as well.
- Case Date:
- 9/21/2023
Trash was not collected ion E Cambridge Ct 47408 yesterday 9/20/23. Our bin at 4509 was out night prior and still full as are our neighbors. Please advise if we should leave out or wait until next week. Thank you.
- Case Date:
- 6/26/2025
Abandoned foam mattress on the corner of S Henderson and Graham, south of BHSS.
- Case Date:
- 7/11/2025
Potholes, Other Street Repair
- Case Date:
- 7/25/2025
Thanks to the Zach Sowders crew for making Adams St between 7th and the Bline a safer and more appealing thorough fare.
- Case Date:
- 8/8/2025
1040 Chris Lane , trash and food waste left at side of driveway and in yard - Pendragon property
- Case Date:
- 7/23/2025
518 S. Park trash on sidewalk and front lawn.
- Case Date:
- 7/8/2025
IRT U-Report 204012. the trash is located on city property at the intersection of E. Sheridan Drive and S. Ballantine. Did the inspector look at all four corners of the intersection????? I would have to guess not, as the garbage is still there!! Please take a second and look and do a more thorough inspection. Thank you.
Potholes, Other Street Repair
- Case Date:
- 8/14/2025
I had sent in a request on 5/19/25 Case #202787 reporting that Olive Street needs a concrete curb installed. Due to the excessive rainfall this has caused flooding issues for 1502 S. Olive and the house on the corner of Hillside and Olive (1144 E. Hillside Dr.). I was informed that this was on the paving list and there was plans for an asphalt curb. I called on 6/9/25 and spoke to the Engineering dept. (Iris) about installing a concrete curb instead of asphalt. There is already a partial concrete curb that runs past 1502. It needs to have a concrete curb all the way up the hill so that rain will not flood into the driveway and along the house of 1502, plus it runs past the curb into the yard of 1144 E. Hillside causing flooding in the basement. They have a sump pump now, but it's old and could quit at any time. It's already August and there hasn't been any kind of activity on this street. Do you have an estimated date as to when the street will be paved and the curb installed? Also, there is a construction sign in the yard of 1144 E. Hillside that has been there all summer and would like it to be moved. Thank you for any information you can provide!