closed #204317
Trash
743 S Park Square DR
- Case Date:
- 7/18/2025
Trash piled on side of house
Trash piled on side of house
More trash on side of house again
Trash beside home
Tenant keeps piling trash between units
Pothole near Atwater Eye Center. Has been patched before but patch is breaking apart.
Weeds growing along w 2nd Street makes taking a left turn out of Euclid very dangerous. Can’t see oncoming cars
Fiber contractors did not tunnel deep enough when they crossed the B-Line (what a surprise!). In the section of the trail between 1st and Dodds there is now a sort of "speed bump" spanning the width of the trail pavement from where they crossed from one side to the other.
Similar to the previous case #193719, the new fiber optic cables that were installed have created speed humps along the Bline trail between Dodds and 1st. I've seen that this is to be repaired already, but I want to add another complaint point to ensure visibility. Additionally, south of the trail tree roots have begun to surface creating large bumps/uneven terrain closer to Dodds St. The roots were attempted to be repaired with crack sealer, but the bumps still exist.
Pole 85. More f****ing needles
Recycable items not properly sorted. 946