uReport

City of Bloomington, Indiana – John Hamilton, Mayor

Search

Fields to display

Search Results: (27)

closed #175194

Potholes, Other Street Repair

1375 N Wellness WAY

Case Date:
3/23/2021

Water access cover in the roadway damaged and posing hazard to cars. Immediately SW of the YMCA before N Knapp Rd.

closed #170460

Water Utility Problems

1412 N Sumac CT

Case Date:
9/22/2019

Water shut is off

closed #121181

Water Quality

1800 N Curry PIKE

Case Date:
7/31/1996

Flow test crew was flushing fire hydrants in the 1800 - 1900 block of S. Curry Pike. Complainant's water was dirty, and wife did clothes that turned out dingy even though notice was published about the flow testing.

closed #137042

Drainage or Runoff

3048 N Natasha DR

Case Date:
4/4/2014

He has issues with water causing erosion in their backyard and wants to know what they're allowed to do re:drainage and where to route it.

closed #37981

Water Utility Billing Problems

3912 W Woodyard RD

Case Date:
2/12/2004

Letter from Cheryl Crider-Jackson indicated she was gone 10 days of billing period in August '03. She believes her water usage was too high for that period and would like review by USB Adm. Subcommittee.

closed #135063

Sewer Problems (Storm Sewers)

4012 W Broadway AVE

Case Date:
10/31/2013

Storm ditch is clogged and full of rain water in front of his home, and up and down the street on both sides.

closed #47538

Water Utility Problems

4013 W Woodyard RD

Case Date:
10/12/2001

WATER IS SHOTING UP IN THE YARD

closed #49860

Sewer Problems (Sanitary Sewers)

4061 W Broadway AVE

Case Date:
5/30/2001

WATER IS LOW IN STOOL, THERE IS AN ODOR, AND IT IS BUBBLING

closed #163186

Potholes, Other Street Repair

4079 W Geranium LN

Case Date:
2/16/2018

entire geranium lane is covered in large pothols and now water is standing in multiple areas

closed #35356

Water Utility Billing Problems

4111 W Vernal PIKE

Case Date:
8/17/2004

Mobile home park pump station not able to pump sewer upgravity. Shannon Childers, Mgr., says they have to have sewage pumped and hauled off and feels they are paying twice for sewage disposal, plus they are fored to use water hydrants for clean-up and boaring the new force mains.