Sewer Problems (Sanitary Sewers)
2420 E Rock Creek DR
- Case Date:
- 10/18/2022
We had Weddle Plumbing out today to rod-out our main sewer line (due to slowness). He didn't find the usual root issue they normally do on our line, and when he checked the city sewer access, we found the main sewer water level unusually high (and at times stagnant). See image attached. It seems like the city's main line may also need rodding. I hope this can be serviced soon, before it affects (back up into) our line (again?).
Sewer Problems (Sanitary Sewers)
1712 S Williams CT
- Case Date:
- 11/26/2022
At least two sanitary sewer cleanouts in the ROW with sewage leaking out. One is in the middle of the sidewalk at the Northeast corner of S High Street and E Arden. The other cleanout is about 50 feet North of the cleanout in the sidewalk.
Sewer Problems (Sanitary Sewers)
2320 E Rock Creek DR
- Case Date:
- 8/27/2023
Since the storm Friday night, our toilets and sink are gurgling and not flushing well. We have a manhole in front of our house and another one next door at the corner of Rock Creek and Montclair. It seems like we have a clog from that storm. The neighbors across the street are having the same issue. Thank you.
Sewer Problems (Storm Sewers)
2311 E Wimbleton LN
- Case Date:
- 4/29/2021
Drain is completely clogged
Sewer Problems (Storm Sewers)
2414 E Rock Creek DR
- Case Date:
- 4/11/2022
The storm drain in front of my house clogs repeatedly. This is the storm drain on the south side of the street. Please replace the old storm drain grill with a more modern one like the one across the street. Today the water was backed up so high that it took me 5 minutes of work just to find the grill so that I could clear it.
Sewer Problems (Storm Sewers)
1904 S Montclair AVE
- Case Date:
- 6/7/2022
Road construction has Queens Way blocked. Construction was on the website earlier but has been removed. Construction is definitely NOT COMPLETED. Please update website with construction and new completion date.
Sewer Problems (Storm Sewers)
2315 E Queens WAY
- Case Date:
- 6/29/2022
This intersection drainage project has been weeks ongoing. Now we are left with an absolutely horrid street. The utility cuts were filled with gravel but have rutted out to be almost impassable. This is addition to the pot holes and drains that are unfinished.
Sidewalk & Curb Complaints
2221 S High ST
- Case Date:
- 3/21/2021
Damaged sidewalk is a trip hazard
Sidewalk & Curb Complaints
2003 S High ST
- Case Date:
- 8/16/2021
It has been 11 weeks since Millstone tore out my driveway and the sidwalk. It is still an awful mess. 3 weeks ago I got a notice from them that they would be replacing my driveway “this week”. It is still a terrible, muddy mess that struggle to drive through. No progress on the driveways anywhere in 6 days. FFS WHEN is this going to be completed? I want my damned driveway back. It’s almost September.
Sidewalk & Curb Complaints
2105 E Queens WAY
- Case Date:
- 8/22/2021
FINSISH THIS PRJECT