City Construction Projects
- Case Date:
- 7/13/2021
Large semi (red cab) towing longer than usual flatbed failed to make turn from Rogers to high and hit the street light, which almost fell over, now severely damaged, and possibly hazardous. Happened at 4 pm today July 13. Presumably there to collect construction equipment on high st.
City Construction Projects
- Case Date:
- 7/15/2021
The sidewalk on N Lincoln between 15th and 16th has been completely torn up by tree roots. It’s unsafe and unusable for someone with a wheelchair or stroller.
City Construction Projects
- Case Date:
- 8/13/2021
This is the ONLY PLACE in this fucking state where you gotta wear a mask!!! Fuck you liberal cocksuckers!!!
City Construction Projects
- Case Date:
- 4/20/2022
The city recently replaced worn some worn curbs and this week repaved a big section of Park Ridge Road in Park Ridge East. The crew did an exceptional job! However, on the east side of the street between the park and Sheffield Drive there is a considerable amount of chunky gravel and dirt left on the sidewalk. Will the city please send someone to clean it up? Thank you so much.
City Construction Projects
- Case Date:
- 6/14/2022
Location, Ticket 180318, NW corner N Park Ridge Rd & E Cambridge Dr. Perhaps others?
City Construction Projects
- Case Date:
- 5/11/2023
Lumber on round about Tapp Road going west just before taking 69N towards Indpls. Could be dangerous if it gets on rotunda especially at night!
City Construction Projects
- Case Date:
- 9/7/2022
Badly needed stop light at Tapp Rd. & Leonard Springs. Also, a tree blocks visibility at this location.
City Construction Projects
- Case Date:
- 12/3/2022
Orange barrels on 17th street , are creating a hazard pulling out of willis drive .
City Construction Projects
- Case Date:
- 1/29/2021
There is a utility cut near the intersection of E First and Henderson near #521, that has not been properly paved over. This can be a hazard to motorists' tires, since there is no warning sign at all about this cut.Especially at night not visible.
City Construction Projects
- Case Date:
- 7/11/2022
In front of house 725 E Second Street is a nasty utility cut.