uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (101)

closed #182528

City Construction Projects

Greenwood Ave, Bloomington, IN 47401, USA

Case Date:
1/19/2023

One week ago, people were laying internet cable in our neighborhood. They left last Friday, but there are still sizeable holes in the streets, each of which is an injury and lawsuit waiting to happen. My yard has a hole in the grass and a pile of dirt. There are no covers for these holes, and they are very dangerous for kids and adults (its a walk-to-school route). This work was carried out with no notice to the households, and they left it unfinished with no safety precautions. I live at 1011 S. Greenwood Ave. This photo is of one the holes at the corner of Rose and Dexter, which I have to avoid while biking to work. It's about 10" across. Can you make sure that these holes are covered and that the dirt in my yard is cleared up? Thanks.

closed #182309

City Construction Projects

Case Date:
12/22/2022

The newly redone exit on Clarizz for Bloomingfoods East and the new apartment complex is too narrow by about 3 feet. It is nearly impossible for two vehicles to be in the intersection at the same time, and turning in or out is in-executable while another vehicle is present. Personally I have seen many instances that a car has to stop in the intersection to allow for a car to clear the way. This is a highly trafficked intersection that will only become more heavily traveled once the multiplex is finished and occupied. Thus, this intersection poses great risk for incident in its current configuration.

closed #182644

City Construction Projects

323 1/2 S Lincoln ST

Case Date:
1/27/2023

The signs giving instructions for the back-in parking should have the diagram (map) rotated 180 degrees. The standard for such diagrams is to have the direction of movement going UP the page, not down. Also, the parking spaces are shown on the right side of the diagram; it looks like you are instructed to front into spaces on the right (the small arrows pointing down are hard to notice, while the up-&-right arrow is large).

closed #182808

City Construction Projects

Case Date:
2/11/2023

Stop light is not needed at John Hinkle and 10th per some reporter but is needed at the substantially busier and more dangerous intersection of Smith and 10th.

closed #183091

City Construction Projects

Case Date:
3/9/2023

Several weeks ago on 8th Street in Hopewell The house in the corner had some kind of construction where the city road was tore up they have since left some of it was fixed but they're still an uneven spot on the road can we get this addressed and fixed?

closed #183101

City Construction Projects

1521 S Arbors LN

Case Date:
3/12/2023

Moors and Clarizz, the fiber contractors left a large rectangular hole in the asphalt by the arbors entrance

closed #183266

City Construction Projects

Case Date:
3/28/2023

At 414 S Lincoln there is a nasty utility cut, no warning sign and no other option than to drive over it. Hope it can be fixed soon. Thanks!

closed #177625

City Construction Projects

Case Date:
9/24/2021

My daughter Jordan Tackett has been missing 3 weeks Ed Silvers knows where she is and Wendy Renee Clensy Wolfe drugged raped and left me for dead Sept 7, 2019

closed #177645

City Construction Projects

Case Date:
9/26/2021

wendy renee clensy wolfe drugged raped and left me for dead Sept 7, 2019 i believe she did this to my son in law Zhain Tackett

closed #186167

City Construction Projects

1907 S Sussex DR

Case Date:
11/1/2023

Fiber construction contractors (AEG?) were in our neighborhood (Sycamore Knolls) at the start of October. They've since moved on, but left open holes and piping sticking out the ground all over the place. These were visible, but with the falling leaves they have become numerous trip hazards spread throughout the neighborhood.